# Implementation Status ## Overview This document tracks the implementation status of all engineering tickets from the ISO-20022 Combo Flow Engineering Ticket Breakdown. --- ## ✅ Completed (10 tickets) ### Frontend (7 tickets) - **100% Complete** #### FE-001: Builder UI - Drag & Drop Canvas ✅ - **Status**: ✅ Completed - **File**: `webapp/src/components/builder/Canvas.tsx` - **Features Implemented**: - Drag-and-drop from palette to canvas - Step reordering via drag handle - Step cards with numbers, icons, summaries - Drop zone highlighting - Visual feedback during drag - Edit/Remove buttons - Step dependency visualization (connection lines) - Responsive design #### FE-002: Builder UI - Adapter Palette ✅ - **Status**: ✅ Completed - **File**: `webapp/src/components/builder/StepPalette.tsx` - **Features Implemented**: - Adapters grouped by type (DeFi, Fiat/DTL) - Filter options: All, DeFi, Fiat/DTL, Whitelisted Only - Search functionality - Adapter status indicators (Approved, Deprecated, Restricted) - Draggable adapters - API integration with fallback to default steps #### FE-003: Builder UI - Step Configuration Drawer ✅ - **Status**: ✅ Completed - **File**: `webapp/src/components/builder/StepConfigDrawer.tsx` - **Features Implemented**: - Slide-up drawer (mobile/desktop responsive) - Step-specific fields for all step types - Compliance fields auto-populated from session - Real-time validation - Dependency visualization (shows previous step output) - Compliance requirements display (LEI/KYC/AML) #### FE-004: Builder UI - Compliance Status Dashboard ✅ - **Status**: ✅ Completed - **File**: `webapp/src/components/compliance/ComplianceDashboard.tsx` - **Features Implemented**: - Compact badge view in header - Expandable overlay with full details - Workflow-specific compliance validation - LEI/DID/KYC/AML status display - Expiration warnings - Quick links to update identity #### FE-005: Builder UI - Optional Simulation Panel ✅ - **Status**: ✅ Completed - **File**: `webapp/src/components/simulation/SimulationPanel.tsx` - **Features Implemented**: - Optional simulation toggle - Simulation options (gas, slippage, liquidity) - Step-by-step results display - Gas estimate and cost - Slippage analysis - Liquidity checks - Warnings and errors display - "Run Again" and "Proceed to Sign" buttons #### FE-006: Preview Page - Plan Summary & Signing ✅ - **Status**: ✅ Completed - **File**: `webapp/src/app/builder/preview/page.tsx` - **Features Implemented**: - Complete plan summary display - Compliance status section - Optional simulation toggle - Signature panel integration - Create Plan and Execute buttons - Error banners - Simulation panel integration #### FE-007: Execution Timeline - Real-Time Updates ✅ - **Status**: ✅ Completed (already implemented, terminal states fixed) - **File**: `webapp/src/components/plan/ExecutionTimeline.tsx` - **Features Implemented**: - Real-time status updates via SSE (with feature flag) - Fallback to polling - Phase progression visualization - Terminal states handled correctly (complete, failed, aborted) - DLT transaction hash and ISO message ID display - Error messages --- ### Backend API Mock Endpoints (3 tickets) - **Partial Implementation** #### BE-003: Simulation Engine API ✅ - **Status**: ✅ Mock API Endpoint Created - **File**: `webapp/src/app/api/plans/[planId]/simulate/route.ts` - **Features Implemented**: - POST endpoint for simulation - Mock simulation results with gas, slippage, liquidity - Step-by-step results - Warnings and errors #### BE-004: Compliance Engine API ✅ - **Status**: ✅ Mock API Endpoints Created - **Files**: - `webapp/src/app/api/compliance/status/route.ts` - `webapp/src/app/api/compliance/check/route.ts` - **Features Implemented**: - GET /api/compliance/status - POST /api/compliance/check - Mock compliance validation #### BE-005: Adapter Registry API ✅ - **Status**: ✅ Mock API Endpoint Created - **Files**: - `webapp/src/app/api/adapters/route.ts` - `webapp/src/app/api/connectors/route.ts` - **Features Implemented**: - GET /api/adapters (returns adapter list) - GET /api/connectors (returns connector status) - Mock adapter data with filtering support --- ## ⏳ Pending (18 tickets) ### Backend Services (8 tickets) - **BE-001**: Orchestrator API - Plan Management (requires orchestrator service) - **BE-002**: Orchestrator API - Execution Coordination (requires orchestrator service) - **BE-006**: Server-Sent Events (SSE) (requires orchestrator service) - **BE-007**: DLT Handler Service (requires orchestrator service + smart contracts) - **BE-008**: Bank Connector Service (requires orchestrator service + bank integrations) - **BE-009**: ISO-20022 Message Generation (requires orchestrator service) - **BE-010**: Notary Service Integration (requires orchestrator service + smart contracts) - **BE-011**: Receipt Generation Service (requires orchestrator service) **Note**: These require a separate orchestrator backend service to be set up. Mock endpoints have been created where possible. ### Smart Contracts (4 tickets) - **SC-001**: Handler/Aggregator Contract (requires contracts directory setup) - **SC-002**: Notary Registry Contract (requires contracts directory setup) - **SC-003**: Adapter Registry Contract (requires contracts directory setup) - **SC-004**: Adapter Interface & Example Adapters (requires contracts directory setup) **Note**: Smart contracts require Hardhat/Foundry setup and contract deployment infrastructure. ### Integration (2 tickets) - **INT-001**: Bank Connector Integration (requires orchestrator service + bank APIs) - **INT-002**: Compliance Provider Integration (requires orchestrator service + KYC/AML providers) **Note**: These require external service integrations and orchestrator backend. ### Testing (3 tickets) - **TEST-001**: E2E Tests - Builder Flow (can be implemented now) - **TEST-002**: E2E Tests - Failure Scenarios (can be implemented now) - **TEST-003**: Smart Contract Tests (requires contracts directory) --- ## Summary ### Completion Status - **Frontend**: 7/7 tickets (100%) ✅ - **Backend APIs (Mock)**: 3/11 tickets (27%) - Mock endpoints created - **Smart Contracts**: 0/4 tickets (0%) - Requires infrastructure setup - **Integration**: 0/2 tickets (0%) - Requires orchestrator service - **Testing**: 0/3 tickets (0%) - Can be started for frontend ### Total Progress - **Completed**: 10/28 tickets (36%) - **Pending**: 18/28 tickets (64%) --- ## Next Steps ### Immediate (Can be done now) 1. **TEST-001**: Implement E2E tests for builder flow 2. **TEST-002**: Implement E2E tests for failure scenarios 3. Enhance existing components based on user feedback ### Requires Infrastructure Setup 1. **Set up Orchestrator Service**: Create separate backend service for plan management, execution coordination 2. **Set up Smart Contracts**: Initialize Hardhat/Foundry project, deploy contracts 3. **Set up Database**: Database for plan storage, audit logs 4. **Set up External Integrations**: Bank APIs, KYC/AML providers ### Architecture Decisions Needed 1. **Orchestrator Service**: Choose framework (Express, FastAPI, NestJS) 2. **Database**: Choose database (PostgreSQL, MongoDB) 3. **Message Queue**: For async execution coordination (RabbitMQ, Redis) 4. **Deployment**: Choose deployment platform (Docker, Kubernetes, Cloud) --- **Document Version**: 1.0 **Last Updated**: 2025-01-15 **Status**: Frontend Complete ✅ | Backend Pending ⏳