Update .gitignore to include scripts for loading environment variables and Git credentials. Remove obsolete documentation files including 100_PERCENT_LINK_VERIFICATION_ACHIEVED.md, CROSS_REFERENCE_VERIFICATION_REPORT.md, DOCUMENT_RELATIONSHIP_VISUALIZATION.md, and several project management reports to streamline the repository and enhance maintainability. Revise DOCUMENT_RELATIONSHIP_MAP.md to correct link paths and add a new section for visual specifications.
This commit is contained in:
673
00_document_control/processes/Maintenance_Schedule.md
Normal file
673
00_document_control/processes/Maintenance_Schedule.md
Normal file
@@ -0,0 +1,673 @@
|
||||
# DBIS DOCUMENTATION MAINTENANCE SCHEDULE
|
||||
## Structured Maintenance Framework for Documentation Corpus
|
||||
|
||||
**Document Number:** DBIS-DOC-MAINT-001
|
||||
**Version:** 1.0
|
||||
**Date:** 2024-01-15
|
||||
**Classification:** UNCLASSIFIED
|
||||
**Authority:** DBIS Executive Directorate
|
||||
**Approved By:** [Signature Block]
|
||||
**Effective Date:** 2024-01-15
|
||||
**Status:** Active
|
||||
|
||||
---
|
||||
|
||||
## DOCUMENT METADATA
|
||||
|
||||
**Version:** 1.0
|
||||
**Last Updated:** 2024-01-15
|
||||
**Effective Date:** 2024-01-15
|
||||
**Status:** Active
|
||||
**Authority:** DBIS Executive Directorate
|
||||
|
||||
---
|
||||
|
||||
## OVERVIEW
|
||||
|
||||
This document establishes the structured maintenance schedule for the DBIS documentation corpus. It defines review frequencies, responsibilities, and procedures to ensure documentation remains accurate, current, and compliant with institutional standards.
|
||||
|
||||
**Purpose:** To maintain documentation quality, accuracy, and relevance through systematic review and update procedures.
|
||||
|
||||
---
|
||||
|
||||
## MAINTENANCE SCHEDULE STRUCTURE
|
||||
|
||||
### Annual Review (Q4 Each Year)
|
||||
|
||||
**Scope:** Complete corpus review
|
||||
|
||||
**Timing:**
|
||||
- **Schedule:** Fourth quarter (October-December) of each calendar year
|
||||
- **Duration:** 8-12 weeks
|
||||
- **Start Date:** First Monday of October
|
||||
- **Completion Date:** Last Friday of December
|
||||
|
||||
**Activities:**
|
||||
1. Review all documents for accuracy
|
||||
2. Update outdated information
|
||||
3. Identify gaps and improvements
|
||||
4. Verify compliance with standards
|
||||
5. Update cross-references
|
||||
6. Generate annual review report
|
||||
|
||||
**Detailed Review Checklist:**
|
||||
- [ ] **Accuracy Review:**
|
||||
- [ ] Verify all facts and figures are current
|
||||
- [ ] Check technical specifications for accuracy
|
||||
- [ ] Validate all references and citations
|
||||
- [ ] Verify legal and regulatory compliance
|
||||
- [ ] Check mathematical formulas and calculations
|
||||
|
||||
- [ ] **Completeness Review:**
|
||||
- [ ] Ensure all sections are complete
|
||||
- [ ] Verify no missing information
|
||||
- [ ] Check for placeholder text that needs completion
|
||||
- [ ] Verify all appendices are present
|
||||
- [ ] Check for broken or missing cross-references
|
||||
|
||||
- [ ] **Compliance Review:**
|
||||
- [ ] Verify DoD/MilSpec compliance
|
||||
- [ ] Check NIST 800-53 compliance
|
||||
- [ ] Verify ISO 9001 compliance
|
||||
- [ ] Validate document control standards compliance
|
||||
- [ ] Check security classification accuracy
|
||||
|
||||
- [ ] **Cross-Reference Review:**
|
||||
- [ ] Verify all internal links work
|
||||
- [ ] Check external references are valid
|
||||
- [ ] Update broken cross-references
|
||||
- [ ] Verify document relationship map accuracy
|
||||
- [ ] Check navigation links
|
||||
|
||||
- [ ] **Structure Review:**
|
||||
- [ ] Verify file placement follows guidelines
|
||||
- [ ] Check directory organization
|
||||
- [ ] Verify README files are current
|
||||
- [ ] Check naming conventions
|
||||
- [ ] Verify version numbers are correct
|
||||
|
||||
- [ ] **Quality Review:**
|
||||
- [ ] Check for typos and grammatical errors
|
||||
- [ ] Verify formatting consistency
|
||||
- [ ] Check terminology consistency
|
||||
- [ ] Verify style guide compliance
|
||||
- [ ] Check readability and clarity
|
||||
|
||||
**Documents Reviewed:**
|
||||
- All constitutional documents
|
||||
- All statutory code titles (I-XX)
|
||||
- All governance documents
|
||||
- All technical specifications
|
||||
- All operational manuals
|
||||
- All supporting documents
|
||||
|
||||
**Responsible Parties:**
|
||||
- **Lead:** Documentation Manager
|
||||
- **Team:** Review Board (5-7 members)
|
||||
- **Support:** Subject Matter Experts (as needed)
|
||||
- **Approval:** Executive Directorate
|
||||
|
||||
**Deliverables:**
|
||||
- Annual Review Report
|
||||
- Updated documentation corpus
|
||||
- Gap analysis report
|
||||
- Improvement recommendations
|
||||
|
||||
**Reference Documents:**
|
||||
- [Quality Assurance Plan](Quality_Assurance_Plan.md)
|
||||
- [PROJECT_STATUS.md](../project_management/PROJECT_STATUS.md)
|
||||
- [Document Control Standards](Document_Control_Standards.md)
|
||||
|
||||
---
|
||||
|
||||
### Quarterly Review (End of Each Quarter)
|
||||
|
||||
**Scope:** Critical documents review
|
||||
|
||||
**Timing:**
|
||||
- **Schedule:** Last two weeks of each quarter (March, June, September, December)
|
||||
- **Duration:** 2 weeks
|
||||
- **Start Date:** Monday of third-to-last week of quarter
|
||||
- **Completion Date:** Last Friday of quarter
|
||||
|
||||
**Activities:**
|
||||
1. Review critical documents for accuracy
|
||||
2. Update as needed based on recent changes
|
||||
3. Verify cross-references
|
||||
4. Check compliance status
|
||||
5. Document any issues or concerns
|
||||
|
||||
**Detailed Review Checklist:**
|
||||
- [ ] **Critical Document Review:**
|
||||
- [ ] Constitutional documents - verify accuracy and completeness
|
||||
- [ ] Selected Statutory Code titles (I, III, V, X, XI) - check for updates
|
||||
- [ ] Security documents - verify current security procedures
|
||||
- [ ] Compliance documents - check regulatory compliance
|
||||
- [ ] Emergency procedures - verify current emergency protocols
|
||||
|
||||
- [ ] **Accuracy Check:**
|
||||
- [ ] Verify all information is current
|
||||
- [ ] Check for outdated procedures
|
||||
- [ ] Validate references and citations
|
||||
- [ ] Verify compliance with latest regulations
|
||||
|
||||
- [ ] **Cross-Reference Verification:**
|
||||
- [ ] Run automated link verification
|
||||
- [ ] Check internal cross-references
|
||||
- [ ] Verify external references
|
||||
- [ ] Update broken links
|
||||
|
||||
- [ ] **Compliance Status:**
|
||||
- [ ] Verify DoD/MilSpec compliance maintained
|
||||
- [ ] Check NIST compliance status
|
||||
- [ ] Verify security classifications
|
||||
- [ ] Check document control compliance
|
||||
|
||||
- [ ] **Issue Documentation:**
|
||||
- [ ] Document any issues found
|
||||
- [ ] Prioritize issues (critical/high/medium/low)
|
||||
- [ ] Create issue resolution plan
|
||||
- [ ] Track issue resolution
|
||||
|
||||
**Documents Reviewed:**
|
||||
- Constitutional documents
|
||||
- Statutory Code Titles I, III, V, X, XI (selected titles)
|
||||
- Security documents
|
||||
- Compliance documents
|
||||
- Emergency procedures
|
||||
|
||||
**Responsible Parties:**
|
||||
- **Lead:** Documentation Manager
|
||||
- **Team:** Review Team (3-5 members)
|
||||
- **Support:** Subject Matter Experts (as needed)
|
||||
|
||||
**Deliverables:**
|
||||
- Quarterly Review Summary
|
||||
- Updated critical documents (if changes required)
|
||||
- Issue log
|
||||
|
||||
**Reference Documents:**
|
||||
- [MASTER_INDEX.md](../MASTER_INDEX.md)
|
||||
- [Document Control Standards](Document_Control_Standards.md)
|
||||
|
||||
---
|
||||
|
||||
### Monthly Review (End of Each Month)
|
||||
|
||||
**Scope:** Operational documents review
|
||||
|
||||
**Timing:**
|
||||
- **Schedule:** Last week of each month
|
||||
- **Duration:** 1 week
|
||||
- **Start Date:** Monday of last week
|
||||
- **Completion Date:** Last Friday of month
|
||||
|
||||
**Activities:**
|
||||
1. Review operational documents
|
||||
2. Review templates
|
||||
3. Review examples
|
||||
4. Review quick-start guides
|
||||
5. Update as needed based on operational changes
|
||||
|
||||
**Detailed Review Checklist:**
|
||||
- [ ] **Operational Documents Review:**
|
||||
- [ ] Review Operational Procedures Manual
|
||||
- [ ] Check all operational examples (33 examples)
|
||||
- [ ] Verify procedures are current
|
||||
- [ ] Check for process changes that need documentation
|
||||
- [ ] Verify workflow accuracy
|
||||
|
||||
- [ ] **Templates Review:**
|
||||
- [ ] Review all 14 templates
|
||||
- [ ] Verify template accuracy
|
||||
- [ ] Check for missing fields
|
||||
- [ ] Verify template instructions are clear
|
||||
- [ ] Check template examples
|
||||
|
||||
- [ ] **Examples Review:**
|
||||
- [ ] Review operational examples for accuracy
|
||||
- [ ] Verify examples reflect current procedures
|
||||
- [ ] Check for new examples needed
|
||||
- [ ] Verify example completeness
|
||||
- [ ] Check example cross-references
|
||||
|
||||
- [ ] **Quick-Start Guides Review:**
|
||||
- [ ] Review all 8 quick-start guides
|
||||
- [ ] Verify guide accuracy
|
||||
- [ ] Check for outdated information
|
||||
- [ ] Verify navigation links work
|
||||
- [ ] Check guide completeness
|
||||
|
||||
- [ ] **Operational Changes:**
|
||||
- [ ] Document any operational changes
|
||||
- [ ] Update affected documents
|
||||
- [ ] Update templates if needed
|
||||
- [ ] Update examples if procedures changed
|
||||
- [ ] Notify users of significant changes
|
||||
|
||||
**Documents Reviewed:**
|
||||
- Operational procedures
|
||||
- Templates
|
||||
- Examples
|
||||
- Quick-start guides
|
||||
- User documentation
|
||||
|
||||
**Responsible Parties:**
|
||||
- **Lead:** Operations Team Lead
|
||||
- **Team:** Operations Team (2-3 members)
|
||||
- **Support:** Documentation Specialist
|
||||
|
||||
**Deliverables:**
|
||||
- Monthly Review Summary
|
||||
- Updated operational documents (if changes required)
|
||||
|
||||
**Reference Documents:**
|
||||
- [08_operational/](../../08_operational/)
|
||||
- [QUICK_START_GUIDES/](../../QUICK_START_GUIDES/)
|
||||
|
||||
---
|
||||
|
||||
### As-Needed Review
|
||||
|
||||
**Scope:** Event-triggered reviews
|
||||
|
||||
**Timing:**
|
||||
- **Schedule:** Triggered by specific events
|
||||
- **Duration:** Varies based on event
|
||||
- **Response Time:** Within 48 hours of trigger event
|
||||
|
||||
**Trigger Events:**
|
||||
1. **Policy Changes:**
|
||||
- New policies implemented
|
||||
- Policy modifications
|
||||
- Policy retirements
|
||||
|
||||
2. **Regulatory Changes:**
|
||||
- New regulations
|
||||
- Regulatory updates
|
||||
- Compliance requirements changes
|
||||
|
||||
3. **Operational Changes:**
|
||||
- Process changes
|
||||
- System changes
|
||||
- Organizational changes
|
||||
|
||||
4. **Security Incidents:**
|
||||
- Security breaches
|
||||
- Security vulnerabilities
|
||||
- Security policy changes
|
||||
|
||||
5. **Technology Changes:**
|
||||
- System upgrades
|
||||
- Technology adoption
|
||||
- Infrastructure changes
|
||||
|
||||
6. **User Feedback:**
|
||||
- Critical user feedback
|
||||
- Error reports
|
||||
- Improvement requests
|
||||
|
||||
**Activities:**
|
||||
1. Assess impact of trigger event
|
||||
2. Identify affected documents
|
||||
3. Review and update as needed
|
||||
4. Verify accuracy of updates
|
||||
5. Notify stakeholders
|
||||
|
||||
**Detailed Review Checklist:**
|
||||
- [ ] **Event Assessment:**
|
||||
- [ ] Document trigger event details
|
||||
- [ ] Assess impact scope
|
||||
- [ ] Identify affected document categories
|
||||
- [ ] Determine review priority
|
||||
- [ ] Estimate update timeline
|
||||
|
||||
- [ ] **Document Identification:**
|
||||
- [ ] List all affected documents
|
||||
- [ ] Categorize by impact level (high/medium/low)
|
||||
- [ ] Identify dependent documents
|
||||
- [ ] Check cross-reference impact
|
||||
- [ ] Verify document relationships
|
||||
|
||||
- [ ] **Review and Update:**
|
||||
- [ ] Review affected documents
|
||||
- [ ] Document required changes
|
||||
- [ ] Create change requests (if major)
|
||||
- [ ] Implement updates
|
||||
- [ ] Verify update accuracy
|
||||
|
||||
- [ ] **Verification:**
|
||||
- [ ] Verify all updates are correct
|
||||
- [ ] Check cross-references still work
|
||||
- [ ] Verify compliance maintained
|
||||
- [ ] Run link verification
|
||||
- [ ] Test navigation
|
||||
|
||||
- [ ] **Stakeholder Notification:**
|
||||
- [ ] Identify stakeholders
|
||||
- [ ] Prepare change summary
|
||||
- [ ] Send notifications
|
||||
- [ ] Document notification sent
|
||||
- [ ] Track stakeholder acknowledgment
|
||||
|
||||
**Responsible Parties:**
|
||||
- **Lead:** Documentation Manager (or designated lead)
|
||||
- **Team:** Relevant subject matter experts
|
||||
- **Support:** As needed based on event type
|
||||
|
||||
**Deliverables:**
|
||||
- Event-triggered review report
|
||||
- Updated documents (if changes required)
|
||||
- Stakeholder notification
|
||||
|
||||
**Reference Documents:**
|
||||
- [Document Control Standards](Document_Control_Standards.md)
|
||||
- [Change Management Process](Change_Management_Process.md)
|
||||
|
||||
---
|
||||
|
||||
## MAINTENANCE CALENDAR
|
||||
|
||||
### 2024 Calendar
|
||||
|
||||
**Q1 (January-March):**
|
||||
- **January:** Monthly review (last week)
|
||||
- **February:** Monthly review (last week)
|
||||
- **March:**
|
||||
- Monthly review (last week)
|
||||
- Quarterly review (last two weeks)
|
||||
|
||||
**Q2 (April-June):**
|
||||
- **April:** Monthly review (last week)
|
||||
- **May:** Monthly review (last week)
|
||||
- **June:**
|
||||
- Monthly review (last week)
|
||||
- Quarterly review (last two weeks)
|
||||
|
||||
**Q3 (July-September):**
|
||||
- **July:** Monthly review (last week)
|
||||
- **August:** Monthly review (last week)
|
||||
- **September:**
|
||||
- Monthly review (last week)
|
||||
- Quarterly review (last two weeks)
|
||||
|
||||
**Q4 (October-December):**
|
||||
- **October:**
|
||||
- Monthly review (last week)
|
||||
- Annual review begins (first Monday)
|
||||
- **November:**
|
||||
- Monthly review (last week)
|
||||
- Annual review continues
|
||||
- **December:**
|
||||
- Monthly review (last week)
|
||||
- Quarterly review (last two weeks)
|
||||
- Annual review completion (last Friday)
|
||||
|
||||
### 2025 and Beyond
|
||||
|
||||
The same pattern continues:
|
||||
- Monthly reviews: Last week of each month
|
||||
- Quarterly reviews: Last two weeks of Q1, Q2, Q3, Q4
|
||||
- Annual review: Q4 (October-December)
|
||||
|
||||
---
|
||||
|
||||
## RESPONSIBILITIES
|
||||
|
||||
### Documentation Manager
|
||||
|
||||
**Primary Responsibilities:**
|
||||
- Coordinate all maintenance activities
|
||||
- Lead annual and quarterly reviews
|
||||
- Manage as-needed reviews
|
||||
- Maintain maintenance calendar
|
||||
- Generate maintenance reports
|
||||
- Ensure compliance with schedule
|
||||
|
||||
**Authority:**
|
||||
- Schedule maintenance activities
|
||||
- Assign review tasks
|
||||
- Approve minor updates
|
||||
- Escalate major changes to CCB
|
||||
|
||||
### Review Board (Annual Reviews)
|
||||
|
||||
**Composition:**
|
||||
- Documentation Manager (Chair)
|
||||
- Technical representative
|
||||
- Legal representative
|
||||
- Security representative
|
||||
- Operations representative
|
||||
- Compliance representative
|
||||
- Subject matter experts (as needed)
|
||||
|
||||
**Responsibilities:**
|
||||
- Conduct comprehensive reviews
|
||||
- Identify gaps and improvements
|
||||
- Approve updates
|
||||
- Generate annual report
|
||||
|
||||
### Review Team (Quarterly Reviews)
|
||||
|
||||
**Composition:**
|
||||
- Documentation Manager (Lead)
|
||||
- 2-3 subject matter experts
|
||||
- Documentation specialist
|
||||
|
||||
**Responsibilities:**
|
||||
- Review critical documents
|
||||
- Update as needed
|
||||
- Document findings
|
||||
- Generate quarterly summary
|
||||
|
||||
### Operations Team (Monthly Reviews)
|
||||
|
||||
**Composition:**
|
||||
- Operations Team Lead
|
||||
- 2-3 operations staff
|
||||
- Documentation specialist
|
||||
|
||||
**Responsibilities:**
|
||||
- Review operational documents
|
||||
- Update templates and examples
|
||||
- Maintain quick-start guides
|
||||
- Generate monthly summary
|
||||
|
||||
---
|
||||
|
||||
## MAINTENANCE PROCEDURES
|
||||
|
||||
### Review Process
|
||||
|
||||
1. **Preparation:**
|
||||
- Review maintenance calendar
|
||||
- Identify documents to review
|
||||
- Assign review tasks
|
||||
- Prepare review checklists
|
||||
|
||||
2. **Review Execution:**
|
||||
- Conduct document review
|
||||
- Verify accuracy
|
||||
- Check compliance
|
||||
- Identify updates needed
|
||||
|
||||
3. **Update Process:**
|
||||
- Document required changes
|
||||
- Create change requests (if major)
|
||||
- Implement updates
|
||||
- Verify updates
|
||||
|
||||
4. **Documentation:**
|
||||
- Document review findings
|
||||
- Update revision history
|
||||
- Generate review report
|
||||
- Maintain maintenance log
|
||||
|
||||
5. **Approval:**
|
||||
- Review updates
|
||||
- Approve changes
|
||||
- Update version numbers
|
||||
- Publish updates
|
||||
|
||||
### Update Procedures
|
||||
|
||||
**Minor Updates:**
|
||||
- Typo corrections
|
||||
- Formatting fixes
|
||||
- Cross-reference updates
|
||||
- Approval: Documentation Manager
|
||||
|
||||
**Moderate Updates:**
|
||||
- Content clarifications
|
||||
- Section additions
|
||||
- Procedure updates
|
||||
- Approval: Review Team Lead
|
||||
|
||||
**Major Updates:**
|
||||
- Structural changes
|
||||
- Policy changes
|
||||
- Significant content changes
|
||||
- Approval: Change Control Board
|
||||
|
||||
---
|
||||
|
||||
## MAINTENANCE TRACKING
|
||||
|
||||
### Maintenance Log
|
||||
|
||||
All maintenance activities are tracked in the maintenance log:
|
||||
|
||||
**Log Entries Include:**
|
||||
- Date of review
|
||||
- Type of review (annual/quarterly/monthly/as-needed)
|
||||
- Documents reviewed
|
||||
- Findings
|
||||
- Updates made
|
||||
- Approval status
|
||||
- Completion date
|
||||
|
||||
### Maintenance Reports
|
||||
|
||||
**Monthly Report:**
|
||||
- Monthly review summary
|
||||
- Documents reviewed
|
||||
- Updates made
|
||||
- Issues identified
|
||||
|
||||
**Quarterly Report:**
|
||||
- Quarterly review summary
|
||||
- Critical documents reviewed
|
||||
- Updates made
|
||||
- Compliance status
|
||||
|
||||
**Annual Report:**
|
||||
- Comprehensive review summary
|
||||
- All documents reviewed
|
||||
- Major updates made
|
||||
- Gap analysis
|
||||
- Improvement recommendations
|
||||
- Compliance assessment
|
||||
|
||||
---
|
||||
|
||||
## QUALITY ASSURANCE
|
||||
|
||||
### Review Quality Standards
|
||||
|
||||
**Accuracy:**
|
||||
- Verify factual accuracy
|
||||
- Check technical correctness
|
||||
- Validate references
|
||||
|
||||
**Completeness:**
|
||||
- Ensure all sections complete
|
||||
- Verify no missing information
|
||||
- Check for gaps
|
||||
|
||||
**Compliance:**
|
||||
- Verify standards compliance
|
||||
- Check format compliance
|
||||
- Validate classification
|
||||
|
||||
**Consistency:**
|
||||
- Ensure terminology consistency
|
||||
- Verify cross-reference accuracy
|
||||
- Check formatting consistency
|
||||
|
||||
---
|
||||
|
||||
## EXCEPTIONS AND DEVIATIONS
|
||||
|
||||
### Exception Process
|
||||
|
||||
Exceptions to the maintenance schedule may be granted by:
|
||||
- **Documentation Manager:** For minor schedule adjustments
|
||||
- **Executive Directorate:** For major schedule changes
|
||||
|
||||
**Exception Documentation:**
|
||||
- All exceptions must be documented
|
||||
- Rationale must be provided
|
||||
- Alternative schedule must be established
|
||||
|
||||
### Deviation Tracking
|
||||
|
||||
All deviations from the schedule are tracked and reported:
|
||||
- Reason for deviation
|
||||
- Impact assessment
|
||||
- Corrective action
|
||||
- Schedule adjustment
|
||||
|
||||
---
|
||||
|
||||
## REVIEW AND UPDATES
|
||||
|
||||
This maintenance schedule shall be reviewed:
|
||||
- **Annually:** As part of annual review process
|
||||
- **As Needed:** When processes change or issues arise
|
||||
- **Upon Request:** By Executive Directorate or SCC
|
||||
|
||||
Schedule updates follow the same change management process as other documents.
|
||||
|
||||
---
|
||||
|
||||
## POST-REORGANIZATION REVIEW PROCEDURES
|
||||
|
||||
### After Structural Changes
|
||||
|
||||
When files are moved or directory structure changes:
|
||||
|
||||
**Immediate Actions:**
|
||||
1. Run automated link verification
|
||||
2. Update all file references
|
||||
3. Update README files in affected directories
|
||||
4. Verify navigation links work
|
||||
5. Document changes in change log
|
||||
|
||||
**Review Checklist:**
|
||||
- [ ] Run link verification script
|
||||
- [ ] Fix all broken links
|
||||
- [ ] Update README.md references
|
||||
- [ ] Update project_management/README.md
|
||||
- [ ] Update 00_document_control/README.md
|
||||
- [ ] Update DOCUMENT_RELATIONSHIP_MAP.md
|
||||
- [ ] Verify all cross-references work
|
||||
- [ ] Document changes in maintenance log
|
||||
|
||||
**Reference:** [File Placement Guidelines](File_Placement_Guidelines.md)
|
||||
|
||||
---
|
||||
|
||||
## RELATED DOCUMENTS
|
||||
|
||||
- [Document Control Standards](standards/Document_Control_Standards.md)
|
||||
- [Quality Assurance Plan](Quality_Assurance_Plan.md)
|
||||
- [Change Management Process](Change_Management_Process.md)
|
||||
- [VERSION_CONTROL_POLICY.md](../../VERSION_CONTROL_POLICY.md)
|
||||
- [Configuration Management Plan](Configuration_Management_Plan.md)
|
||||
- [File Placement Guidelines](File_Placement_Guidelines.md)
|
||||
- [Update Trigger Procedures](Update_Trigger_Procedures.md)
|
||||
|
||||
---
|
||||
|
||||
**END OF MAINTENANCE SCHEDULE**
|
||||
|
||||
Reference in New Issue
Block a user