Update .gitignore to include scripts for loading environment variables and Git credentials. Remove obsolete documentation files including 100_PERCENT_LINK_VERIFICATION_ACHIEVED.md, CROSS_REFERENCE_VERIFICATION_REPORT.md, DOCUMENT_RELATIONSHIP_VISUALIZATION.md, and several project management reports to streamline the repository and enhance maintainability. Revise DOCUMENT_RELATIONSHIP_MAP.md to correct link paths and add a new section for visual specifications.
This commit is contained in:
626
00_document_control/processes/Update_Trigger_Procedures.md
Normal file
626
00_document_control/processes/Update_Trigger_Procedures.md
Normal file
@@ -0,0 +1,626 @@
|
||||
# DBIS DOCUMENTATION UPDATE TRIGGER PROCEDURES
|
||||
## Event-Driven Documentation Update Framework
|
||||
|
||||
**Document Number:** DBIS-DOC-TRIG-001
|
||||
**Version:** 1.0
|
||||
**Date:** 2024-01-15
|
||||
**Classification:** UNCLASSIFIED
|
||||
**Authority:** DBIS Executive Directorate
|
||||
**Approved By:** [Signature Block]
|
||||
**Effective Date:** 2024-01-15
|
||||
**Status:** Active
|
||||
|
||||
---
|
||||
|
||||
## DOCUMENT METADATA
|
||||
|
||||
**Version:** 1.0
|
||||
**Last Updated:** 2024-01-15
|
||||
**Effective Date:** 2024-01-15
|
||||
**Status:** Active
|
||||
**Authority:** DBIS Executive Directorate
|
||||
|
||||
---
|
||||
|
||||
## OVERVIEW
|
||||
|
||||
This document establishes procedures for identifying, responding to, and processing trigger events that require documentation updates. It defines update triggers, response workflows, and implementation procedures.
|
||||
|
||||
**Purpose:** To ensure documentation remains current and accurate by systematically responding to events that require updates.
|
||||
|
||||
---
|
||||
|
||||
## UPDATE TRIGGER CATEGORIES
|
||||
|
||||
### 1. Policy Changes
|
||||
|
||||
**Trigger Events:**
|
||||
- New policies implemented
|
||||
- Policy modifications
|
||||
- Policy retirements
|
||||
- Policy clarifications
|
||||
|
||||
**Specific Criteria:**
|
||||
- [ ] New policy document created
|
||||
- [ ] Existing policy modified (any section changed)
|
||||
- [ ] Policy officially retired or superseded
|
||||
- [ ] Policy clarification issued by authority
|
||||
- [ ] Policy interpretation changed
|
||||
- [ ] Policy scope expanded or reduced
|
||||
|
||||
**Decision Tree:**
|
||||
```
|
||||
Policy change detected?
|
||||
├─ New policy → Update relevant statutory code titles, governance docs
|
||||
├─ Policy modified → Update affected sections in all referencing documents
|
||||
├─ Policy retired → Mark as superseded, update all references
|
||||
└─ Policy clarified → Update clarification sections, update examples if needed
|
||||
```
|
||||
|
||||
**Affected Documents:**
|
||||
- Relevant statutory code titles (check Title XVII: Amendments)
|
||||
- Governance documents (Articles of Governance, Governance Procedures Manual)
|
||||
- Operational procedures (affected operational manuals)
|
||||
- Compliance documents (compliance frameworks)
|
||||
- Related templates and examples
|
||||
|
||||
**Response Workflow:**
|
||||
1. **Detection:** Policy change notification received
|
||||
2. **Assessment:** Identify affected documents using cross-reference map
|
||||
3. **Impact Analysis:** Determine update scope and priority
|
||||
4. **Update Planning:** Plan required updates with policy owner
|
||||
5. **Implementation:** Update documents following change management process
|
||||
6. **Verification:** Verify updates with policy owner
|
||||
7. **Notification:** Notify stakeholders per change notification procedures
|
||||
|
||||
**Response Time:** Within 7 business days of policy change
|
||||
|
||||
**Responsible Party:** Documentation Manager with Policy Owner
|
||||
|
||||
**Checklist:**
|
||||
- [ ] Policy change notification received and logged
|
||||
- [ ] Affected documents identified
|
||||
- [ ] Cross-reference impact assessed
|
||||
- [ ] Update plan created
|
||||
- [ ] Policy owner consulted
|
||||
- [ ] Updates implemented
|
||||
- [ ] Policy owner review completed
|
||||
- [ ] Stakeholders notified
|
||||
|
||||
---
|
||||
|
||||
### 2. Regulatory Changes
|
||||
|
||||
**Trigger Events:**
|
||||
- New regulations issued
|
||||
- Regulatory updates
|
||||
- Compliance requirements changes
|
||||
- Regulatory clarifications
|
||||
|
||||
**Specific Criteria:**
|
||||
- [ ] New regulation published by regulatory body
|
||||
- [ ] Existing regulation modified or updated
|
||||
- [ ] Regulation interpretation changed
|
||||
- [ ] Compliance requirement added, modified, or removed
|
||||
- [ ] Regulatory deadline changed
|
||||
- [ ] Regulatory reporting requirement changed
|
||||
|
||||
**Decision Tree:**
|
||||
```
|
||||
Regulatory change detected?
|
||||
├─ New regulation → Update compliance frameworks, legal docs
|
||||
├─ Regulation modified → Update affected compliance sections
|
||||
├─ Compliance requirement changed → Update compliance procedures, checklists
|
||||
└─ Interpretation changed → Update guidance documents, examples
|
||||
```
|
||||
|
||||
**Affected Documents:**
|
||||
- Compliance documents (Title XI: Compliance, Compliance frameworks)
|
||||
- Legal framework documents (04_legal_regulatory/)
|
||||
- Regulatory framework documents (Regional Compliance Frameworks)
|
||||
- Operational procedures (affected operational manuals)
|
||||
- Compliance checklists and templates
|
||||
|
||||
**Response Workflow:**
|
||||
1. **Detection:** Regulatory change notification received
|
||||
2. **Assessment:** Identify affected documents and compliance impact
|
||||
3. **Impact Analysis:** Determine compliance impact and urgency
|
||||
4. **Update Planning:** Plan required updates with legal/compliance team
|
||||
5. **Legal Review:** Legal compliance review (required)
|
||||
6. **Implementation:** Update documents following compliance procedures
|
||||
7. **Verification:** Verify compliance with legal/compliance team
|
||||
8. **Notification:** Notify stakeholders (may require immediate notification)
|
||||
|
||||
**Response Time:** Within 5 business days of regulatory change (may be urgent for compliance-critical changes)
|
||||
|
||||
**Responsible Party:** Documentation Manager with Legal/Compliance Team
|
||||
|
||||
**Checklist:**
|
||||
- [ ] Regulatory change notification received and logged
|
||||
- [ ] Legal/compliance team notified
|
||||
- [ ] Compliance impact assessed
|
||||
- [ ] Affected documents identified
|
||||
- [ ] Update plan created with legal review
|
||||
- [ ] Legal review completed
|
||||
- [ ] Updates implemented
|
||||
- [ ] Compliance verification completed
|
||||
- [ ] Stakeholders notified (may require immediate notification)
|
||||
|
||||
---
|
||||
|
||||
### 3. Operational Changes
|
||||
|
||||
**Trigger Events:**
|
||||
- Process changes
|
||||
- System changes
|
||||
- Organizational changes
|
||||
- Service changes
|
||||
|
||||
**Affected Documents:**
|
||||
- Operational procedures
|
||||
- Technical specifications
|
||||
- User documentation
|
||||
- Training materials
|
||||
|
||||
**Response Workflow:**
|
||||
1. **Detection:** Operational change notification received
|
||||
2. **Assessment:** Identify affected documents
|
||||
3. **Impact Analysis:** Determine update scope
|
||||
4. **Update Planning:** Plan required updates
|
||||
5. **Implementation:** Update documents
|
||||
6. **Verification:** Verify updates
|
||||
7. **Training Update:** Update training materials if needed
|
||||
8. **Notification:** Notify stakeholders
|
||||
|
||||
**Response Time:** Within 3 business days of operational change
|
||||
|
||||
**Responsible Party:** Operations Team Lead with Documentation Manager
|
||||
|
||||
---
|
||||
|
||||
### 4. Security Incidents
|
||||
|
||||
**Trigger Events:**
|
||||
- Security breaches
|
||||
- Security vulnerabilities discovered
|
||||
- Security policy changes
|
||||
- Security procedure updates
|
||||
|
||||
**Specific Criteria:**
|
||||
- [ ] Security breach or incident reported
|
||||
- [ ] Security vulnerability discovered (CVE, zero-day, etc.)
|
||||
- [ ] Security policy changed (Title X: Security)
|
||||
- [ ] Security procedure updated
|
||||
- [ ] Security classification changed
|
||||
- [ ] Security incident response procedure updated
|
||||
- [ ] New security threat identified
|
||||
|
||||
**Decision Tree:**
|
||||
```
|
||||
Security event detected?
|
||||
├─ Critical breach → Immediate update to incident response procedures
|
||||
├─ Vulnerability discovered → Update security procedures, emergency procedures
|
||||
├─ Policy changed → Update Title X, security frameworks
|
||||
└─ Procedure updated → Update operational security procedures, examples
|
||||
```
|
||||
|
||||
**Affected Documents:**
|
||||
- Security framework documents (Title X: Security)
|
||||
- Security procedures (09_intelligence_security/)
|
||||
- Emergency response procedures (13_emergency_contingency/)
|
||||
- Incident response procedures (Security Incident Example)
|
||||
- Security classification guides (Security Classification Guide)
|
||||
|
||||
**Response Workflow:**
|
||||
1. **Detection:** Security incident reported (may be classified)
|
||||
2. **Immediate Assessment:** Identify immediate documentation needs (within 2 hours)
|
||||
3. **Impact Analysis:** Determine security documentation impact
|
||||
4. **Urgent Update Planning:** Plan urgent updates with security team
|
||||
5. **Security Review:** Security team review (required, may be classified)
|
||||
6. **Implementation:** Update documents (may require secure handling)
|
||||
7. **Verification:** Verify security accuracy with security team
|
||||
8. **Notification:** Notify stakeholders (classified as appropriate, may be restricted)
|
||||
|
||||
**Response Time:**
|
||||
- Critical incidents: Within 24 hours
|
||||
- High priority: Within 3 business days
|
||||
- Normal: Within 5 business days
|
||||
|
||||
**Responsible Party:** Security Team Lead with Documentation Manager
|
||||
|
||||
**Checklist:**
|
||||
- [ ] Security event reported and logged (may be classified)
|
||||
- [ ] Security team notified immediately
|
||||
- [ ] Immediate assessment completed
|
||||
- [ ] Security impact assessed
|
||||
- [ ] Affected documents identified
|
||||
- [ ] Urgent update plan created
|
||||
- [ ] Security team review completed
|
||||
- [ ] Updates implemented (may require secure handling)
|
||||
- [ ] Security verification completed
|
||||
- [ ] Stakeholders notified (classified as appropriate)
|
||||
|
||||
---
|
||||
|
||||
### 5. Technology Changes
|
||||
|
||||
**Trigger Events:**
|
||||
- System upgrades
|
||||
- Technology adoption
|
||||
- Infrastructure changes
|
||||
- Software updates
|
||||
|
||||
**Affected Documents:**
|
||||
- Technical specifications
|
||||
- System documentation
|
||||
- Integration guides
|
||||
- API documentation
|
||||
|
||||
**Response Workflow:**
|
||||
1. **Detection:** Technology change notification received
|
||||
2. **Assessment:** Identify affected documents
|
||||
3. **Impact Analysis:** Determine technical documentation impact
|
||||
4. **Update Planning:** Plan required updates
|
||||
5. **Technical Review:** Technical team review
|
||||
6. **Implementation:** Update documents
|
||||
7. **Verification:** Verify technical accuracy
|
||||
8. **Notification:** Notify stakeholders
|
||||
|
||||
**Response Time:** Within 5 business days of technology change
|
||||
|
||||
**Responsible Party:** Technical Team Lead with Documentation Manager
|
||||
|
||||
---
|
||||
|
||||
### 6. User Feedback
|
||||
|
||||
**Trigger Events:**
|
||||
- Critical user feedback
|
||||
- Error reports
|
||||
- Improvement requests
|
||||
- Usability issues
|
||||
|
||||
**Affected Documents:**
|
||||
- User documentation
|
||||
- Quick-start guides
|
||||
- Examples
|
||||
- FAQs
|
||||
|
||||
**Response Workflow:**
|
||||
1. **Detection:** User feedback received
|
||||
2. **Assessment:** Evaluate feedback priority
|
||||
3. **Impact Analysis:** Determine documentation impact
|
||||
4. **Update Planning:** Plan required updates
|
||||
5. **Implementation:** Update documents
|
||||
6. **Verification:** Verify improvements
|
||||
7. **User Notification:** Notify feedback provider
|
||||
8. **Publication:** Publish updates
|
||||
|
||||
**Response Time:**
|
||||
- Critical: Within 2 business days
|
||||
- High priority: Within 5 business days
|
||||
- Normal: Within 10 business days
|
||||
|
||||
**Responsible Party:** Documentation Manager with User Support Team
|
||||
|
||||
---
|
||||
|
||||
## TRIGGER RESPONSE WORKFLOW
|
||||
|
||||
### Step 1: Detection
|
||||
|
||||
**Detection Methods:**
|
||||
- Formal notifications
|
||||
- Change management system
|
||||
- Incident reports
|
||||
- User feedback system
|
||||
- Monitoring systems
|
||||
|
||||
**Detection Responsibilities:**
|
||||
- All staff: Report potential triggers
|
||||
- Documentation Manager: Monitor for triggers
|
||||
- Department heads: Notify of changes
|
||||
- System administrators: Report system changes
|
||||
|
||||
### Step 2: Assessment
|
||||
|
||||
**Assessment Activities:**
|
||||
1. Verify trigger event
|
||||
2. Identify affected documents
|
||||
3. Determine update priority
|
||||
4. Assess resource requirements
|
||||
5. Estimate timeline
|
||||
|
||||
**Assessment Output:**
|
||||
- Trigger event report
|
||||
- Affected documents list
|
||||
- Priority classification
|
||||
- Resource requirements
|
||||
- Timeline estimate
|
||||
|
||||
### Step 3: Impact Analysis
|
||||
|
||||
**Impact Analysis Activities:**
|
||||
1. Analyze document impact
|
||||
2. Identify cross-reference impacts
|
||||
3. Determine compliance impacts
|
||||
4. Assess user impact
|
||||
5. Identify dependencies
|
||||
|
||||
**Impact Analysis Output:**
|
||||
- Impact assessment report
|
||||
- Update scope definition
|
||||
- Risk assessment
|
||||
- Dependencies list
|
||||
|
||||
### Step 4: Update Planning
|
||||
|
||||
**Planning Activities:**
|
||||
1. Define update requirements
|
||||
2. Assign resources
|
||||
3. Create update schedule
|
||||
4. Identify review requirements
|
||||
5. Plan notification strategy
|
||||
|
||||
**Planning Output:**
|
||||
- Update plan
|
||||
- Resource assignments
|
||||
- Schedule
|
||||
- Review requirements
|
||||
- Notification plan
|
||||
|
||||
### Step 5: Implementation
|
||||
|
||||
**Implementation Activities:**
|
||||
1. Update documents
|
||||
2. Update cross-references
|
||||
3. Update revision history
|
||||
4. Update version numbers
|
||||
5. Verify updates
|
||||
|
||||
**Implementation Output:**
|
||||
- Updated documents
|
||||
- Updated cross-references
|
||||
- Revision history entries
|
||||
- Version updates
|
||||
|
||||
### Step 6: Review and Approval
|
||||
|
||||
**Review Activities:**
|
||||
1. Technical review (if technical documents)
|
||||
2. Legal review (if legal documents)
|
||||
3. Security review (if security documents)
|
||||
4. Compliance review (if compliance documents)
|
||||
5. Final approval
|
||||
|
||||
**Review Output:**
|
||||
- Review comments
|
||||
- Approval status
|
||||
- Final approval
|
||||
|
||||
### Step 7: Verification
|
||||
|
||||
**Verification Activities:**
|
||||
1. Verify update accuracy
|
||||
2. Verify cross-references
|
||||
3. Verify compliance
|
||||
4. Verify formatting
|
||||
5. Test updates (if applicable)
|
||||
|
||||
**Verification Output:**
|
||||
- Verification report
|
||||
- Approval for publication
|
||||
|
||||
### Step 8: Notification
|
||||
|
||||
**Notification Activities:**
|
||||
1. Prepare change summary
|
||||
2. Identify stakeholders
|
||||
3. Send notifications
|
||||
4. Update change logs
|
||||
5. Publish updates
|
||||
|
||||
**Notification Output:**
|
||||
- Change notifications sent
|
||||
- Change logs updated
|
||||
- Updates published
|
||||
|
||||
---
|
||||
|
||||
## PRIORITY CLASSIFICATION
|
||||
|
||||
### Critical Priority
|
||||
|
||||
**Criteria:**
|
||||
- Security incidents
|
||||
- Compliance violations
|
||||
- Critical errors
|
||||
- Legal issues
|
||||
|
||||
**Response Time:** Within 24 hours
|
||||
|
||||
**Approval:** Immediate (expedited process)
|
||||
|
||||
### High Priority
|
||||
|
||||
**Criteria:**
|
||||
- Policy changes
|
||||
- Regulatory changes
|
||||
- Major operational changes
|
||||
- Critical user feedback
|
||||
|
||||
**Response Time:** Within 3-5 business days
|
||||
|
||||
**Approval:** Standard process (expedited review)
|
||||
|
||||
### Normal Priority
|
||||
|
||||
**Criteria:**
|
||||
- Minor operational changes
|
||||
- Technology updates
|
||||
- General user feedback
|
||||
- Routine updates
|
||||
|
||||
**Response Time:** Within 10 business days
|
||||
|
||||
**Approval:** Standard process
|
||||
|
||||
### Low Priority
|
||||
|
||||
**Criteria:**
|
||||
- Minor clarifications
|
||||
- Formatting improvements
|
||||
- Non-critical updates
|
||||
|
||||
**Response Time:** Within 20 business days
|
||||
|
||||
**Approval:** Standard process
|
||||
|
||||
---
|
||||
|
||||
## TRIGGER EVENT LOG
|
||||
|
||||
All trigger events are logged in the trigger event log:
|
||||
|
||||
**Log Entries Include:**
|
||||
- Event ID
|
||||
- Event date
|
||||
- Event type
|
||||
- Trigger category
|
||||
- Priority
|
||||
- Affected documents
|
||||
- Status
|
||||
- Completion date
|
||||
- Responsible party
|
||||
|
||||
---
|
||||
|
||||
## ESCALATION PROCEDURES
|
||||
|
||||
### Escalation Triggers
|
||||
|
||||
**Escalate to Documentation Manager:**
|
||||
- Multiple documents affected
|
||||
- Complex updates required
|
||||
- Resource constraints
|
||||
- Timeline concerns
|
||||
|
||||
**Escalate to Change Control Board:**
|
||||
- Major structural changes
|
||||
- Policy-impacting changes
|
||||
- Compliance-critical changes
|
||||
- Multi-department impacts
|
||||
|
||||
**Escalate to Executive Directorate:**
|
||||
- Constitutional changes
|
||||
- Statutory code changes
|
||||
- Strategic changes
|
||||
- High-risk changes
|
||||
|
||||
### Escalation Process
|
||||
|
||||
1. Identify escalation need
|
||||
2. Document escalation rationale
|
||||
3. Notify escalation authority
|
||||
4. Provide supporting information
|
||||
5. Await escalation decision
|
||||
6. Implement escalation decision
|
||||
|
||||
---
|
||||
|
||||
## QUALITY ASSURANCE
|
||||
|
||||
### Update Quality Standards
|
||||
|
||||
**Accuracy:**
|
||||
- Verify factual accuracy
|
||||
- Check technical correctness
|
||||
- Validate references
|
||||
|
||||
**Completeness:**
|
||||
- Ensure all updates complete
|
||||
- Verify no missing information
|
||||
- Check for gaps
|
||||
|
||||
**Compliance:**
|
||||
- Verify standards compliance
|
||||
- Check format compliance
|
||||
- Validate classification
|
||||
|
||||
**Consistency:**
|
||||
- Ensure terminology consistency
|
||||
- Verify cross-reference accuracy
|
||||
- Check formatting consistency
|
||||
|
||||
---
|
||||
|
||||
## TRIGGER DETECTION PROCEDURES
|
||||
|
||||
### Monitoring and Detection
|
||||
|
||||
**Active Monitoring:**
|
||||
- Monitor change management system for policy/regulatory changes
|
||||
- Monitor security incident reporting system
|
||||
- Monitor technology change management system
|
||||
- Monitor user feedback system
|
||||
- Review operational change notifications
|
||||
|
||||
**Detection Responsibilities:**
|
||||
- **All Staff:** Report potential triggers immediately
|
||||
- **Documentation Manager:** Daily review of change notifications
|
||||
- **Department Heads:** Notify Documentation Manager of changes
|
||||
- **System Administrators:** Report system/technology changes
|
||||
- **Security Team:** Report security incidents immediately
|
||||
|
||||
**Detection Log:**
|
||||
- All potential triggers logged in trigger event log
|
||||
- Initial assessment within 24 hours
|
||||
- Priority classification within 48 hours
|
||||
|
||||
## TRIGGER ASSESSMENT TEMPLATE
|
||||
|
||||
**Trigger Event Assessment Form:**
|
||||
|
||||
```
|
||||
Event ID: [Auto-generated]
|
||||
Date Detected: [YYYY-MM-DD]
|
||||
Detected By: [Name/Department]
|
||||
Event Type: [Policy/Regulatory/Operational/Security/Technology/User Feedback]
|
||||
Priority: [Critical/High/Normal/Low]
|
||||
|
||||
Event Description:
|
||||
[Detailed description of trigger event]
|
||||
|
||||
Affected Documents:
|
||||
- [List affected documents]
|
||||
|
||||
Impact Assessment:
|
||||
- [Description of impact]
|
||||
|
||||
Response Plan:
|
||||
- [Planned response actions]
|
||||
|
||||
Timeline:
|
||||
- [Estimated completion date]
|
||||
|
||||
Responsible Party:
|
||||
- [Name/Department]
|
||||
|
||||
Status: [Open/In Progress/Completed]
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## RELATED DOCUMENTS
|
||||
|
||||
- [Document Control Standards](standards/Document_Control_Standards.md)
|
||||
- [Change Management Process](Change_Management_Process.md)
|
||||
- [Maintenance Schedule](Maintenance_Schedule.md)
|
||||
- [Configuration Management Plan](Configuration_Management_Plan.md)
|
||||
- [Risk Management Framework](Risk_Management_Framework.md)
|
||||
- [Change Notification Procedures](Change_Notification_Procedures.md)
|
||||
|
||||
---
|
||||
|
||||
**END OF UPDATE TRIGGER PROCEDURES**
|
||||
|
||||