Files
metaverseDubai/MILESTONES.md

436 lines
10 KiB
Markdown
Raw Permalink Normal View History

# Milestones - Dubai Metaverse
## Overview
This document tracks all project milestones, deliverables, and success criteria for the 90-day Dubai Metaverse production plan.
## Milestone Summary
| Milestone | Target Date | Phase | Status |
|-----------|-------------|-------|--------|
| M1: Project Setup | Day 7 | Phase 1 | ⏳ Pending |
| M2: Blockout Complete | Day 15 | Phase 1 | ⏳ Pending |
| M3: Procedural Generation | Day 22 | Phase 2 | ⏳ Pending |
| M4: Hero Asset Complete | Day 29 | Phase 2 | ⏳ Pending |
| M5: Architecture Complete | Day 36 | Phase 2 | ⏳ Pending |
| M6: Lighting Complete | Day 43 | Phase 3 | ⏳ Pending |
| M7: Vehicles & Water | Day 50 | Phase 3 | ⏳ Pending |
| M8: NPCs Complete | Day 57 | Phase 3 | ⏳ Pending |
| M9: Interactions Complete | Day 64 | Phase 4 | ⏳ Pending |
| M10: Cinematic Complete | Day 71 | Phase 4 | ⏳ Pending |
| M11: Final Delivery | Day 90 | Phase 5 | ⏳ Pending |
**Status Legend**:
- ✅ Complete
- 🟡 In Progress
- ⏳ Pending
- ❌ Blocked
---
## M1: Project Setup (Day 7)
### Deliverables
- ✅ Project charter and technical brief
- ✅ Art bible and visual style guide
- ✅ District selection (Dubai Marina + Cayan Tower)
- ✅ Unreal Engine 5.4 project initialized
- ✅ Version control configured (Git LFS)
- ✅ Project folder structure created
- ✅ Naming conventions established
- ✅ Essential plugins installed
### Success Criteria
- All documentation complete and reviewed
- UE5 project ready for asset import
- Version control working correctly
- Team can begin work immediately
- No blocking issues
### Checklist
- [ ] README.md created
- [ ] PROJECT_CHARTER.md created
- [ ] TECHNICAL_BRIEF.md created
- [ ] ART_BIBLE.md created
- [ ] DISTRICT_SELECTION.md created
- [ ] PROJECT_PLAN.md created
- [ ] PIPELINE.md created
- [ ] NAMING_CONVENTIONS.md created
- [ ] UE5_SETUP.md created
- [ ] PROJECT_SETTINGS.md created
- [ ] PLUGINS.md created
- [ ] VERSION_CONTROL.md created
- [ ] MILESTONES.md created (this file)
- [ ] .gitignore created
- [ ] .gitattributes created
- [ ] UE5 project created and configured
- [ ] Git LFS initialized
- [ ] Plugins installed and verified
---
## M2: Blockout Complete (Day 15)
### Deliverables
- ✅ OpenStreetMap data imported
- ✅ GIS/DEM terrain data processed
- ✅ Playable graybox level
- ✅ Accurate building footprints
- ✅ Road network established
- ✅ Asset list (Tier 1, 2, 3)
- ✅ Blockout review completed
### Success Criteria
- Blockout accurately represents Dubai Marina
- Scale is 1:1 and validated
- Navigation flow is logical
- Asset list is comprehensive
- Layout approved by stakeholders
### Checklist
- [ ] OpenStreetMap data imported
- [ ] Terrain generated from elevation data
- [ ] Building footprints created
- [ ] Road network established
- [ ] Graybox level playable
- [ ] Scale validated (1:1)
- [ ] Navigation flow tested
- [ ] Asset list created (Tier 1, 2, 3)
- [ ] Blockout review completed
- [ ] Stakeholder approval received
---
## M3: Procedural Generation (Day 22)
### Deliverables
- ✅ PCG graphs for building placement
- ✅ PCG graphs for road props
- ✅ PCG graphs for vegetation
- ✅ Houdini HDAs for building generation
- ✅ Populated blockout (60-70% proxy buildings)
- ✅ Procedural workflow documented
### Success Criteria
- Blockout fully populated procedurally
- 60-70% of buildings represented
- Procedural system is reusable
- Performance is acceptable
- Workflow is documented
### Checklist
- [ ] PCG building placement graph created
- [ ] PCG road props graph created
- [ ] PCG vegetation graph created
- [ ] Houdini building generator HDA created
- [ ] Blockout populated with procedural content
- [ ] 60-70% buildings represented
- [ ] Performance tested and acceptable
- [ ] Procedural workflow documented
- [ ] PCG graphs validated
---
## M4: Hero Asset Complete (Day 29)
### Deliverables
- ✅ Cayan Tower high-poly model
- ✅ 8K texture sets (UDIM workflow)
- ✅ Nanite static mesh
- ✅ PBR materials (glass, chrome, etc.)
- ✅ Hero asset imported to UE5
### Success Criteria
- Hero asset is photoreal quality
- 8K textures are properly applied
- Nanite mesh renders correctly
- Materials match reference
- Visual quality meets standards
### Checklist
- [ ] Cayan Tower high-poly model complete
- [ ] 8K texture sets created (UDIM)
- [ ] Materials created (glass, chrome, etc.)
- [ ] Nanite mesh imported to UE5
- [ ] Materials assigned correctly
- [ ] Visual quality validated
- [ ] Performance tested
- [ ] Reference comparison completed
---
## M5: Architecture Complete (Day 36)
### Deliverables
- ✅ 20-40 primary buildings modeled
- ✅ Dubai architecture material library
- ✅ 4K texture sets for buildings
- ✅ Shader variations (dust, fingerprints, weathering)
- ✅ Global decal pass
- ✅ 70-80% buildings at production detail
### Success Criteria
- 70-80% buildings complete
- Material library is comprehensive
- Textures are production quality
- Performance is maintained
- Visual consistency achieved
### Checklist
- [ ] 20-40 primary buildings modeled
- [ ] Material library created
- [ ] 4K textures applied
- [ ] Shader variations created
- [ ] Global decals applied
- [ ] 70-80% buildings at production detail
- [ ] Performance validated
- [ ] Visual consistency checked
---
## M6: Lighting Complete (Day 43)
### Deliverables
- ✅ HDRI sky setup
- ✅ Day/night cycle system
- ✅ Volumetric fog and atmosphere
- ✅ Heat haze shader
- ✅ Post-process volume
- ✅ Sunrise to sunset cycle working
### Success Criteria
- Lighting matches Dubai aesthetic
- Day/night cycle transitions smoothly
- Performance is acceptable
- Visual quality is cinematic
- Atmosphere is realistic
### Checklist
- [ ] HDRI sky configured
- [ ] Directional light with day/night cycle
- [ ] Lumen GI and reflections working
- [ ] Volumetric fog configured
- [ ] Heat haze shader created
- [ ] Post-process volume configured
- [ ] Day/night cycle tested
- [ ] Performance validated
- [ ] Visual quality approved
---
## M7: Vehicles & Water (Day 50)
### Deliverables
- ✅ Dubai supercars (Lamborghini, G-Wagon, Ferrari)
- ✅ Chaos vehicle system working
- ✅ Marina water shader with reflections
- ✅ Particle effects (dust, heat, sand, fountains)
- ✅ AI traffic spline system
- ✅ Drivable vehicle
### Success Criteria
- Vehicles drive realistically
- Water looks photoreal
- Particle effects enhance atmosphere
- Performance is maintained
- All systems functional
### Checklist
- [ ] Supercar models imported/created
- [ ] Chaos vehicle system configured
- [ ] Vehicle controller working
- [ ] Marina water shader created
- [ ] Particle effects created
- [ ] AI traffic system working
- [ ] Vehicles drivable and tested
- [ ] Water simulation validated
- [ ] Performance tested
---
## M8: NPCs Complete (Day 57)
### Deliverables
- ✅ 5-10 MetaHumans created
- ✅ Animation sets (walking, sitting, phone, gestures)
- ✅ Behavior trees for NPCs
- ✅ NPC AI controller
- ✅ ChatGPT integration (optional)
- ✅ NPCs populating district
### Success Criteria
- NPCs look realistic
- Behavior is natural
- Performance is acceptable
- Dialogue system works (if implemented)
- District feels alive
### Checklist
- [ ] 5-10 MetaHumans created
- [ ] Animations imported/created
- [ ] Behavior trees created
- [ ] NPC controller working
- [ ] ChatGPT integration (optional)
- [ ] NPCs placed in level
- [ ] Behavior tested
- [ ] Performance validated
- [ ] Visual quality approved
---
## M9: Interactions Complete (Day 64)
### Deliverables
- ✅ Player controller (first/third-person)
- ✅ Interaction system framework
- ✅ Interactable objects (doors, holograms, info panels, elevators)
- ✅ UI widgets (main menu, mini-map, interaction prompts)
- ✅ Teleport/fast travel system
- ✅ Simple quest/navigation system
### Success Criteria
- All interactions work correctly
- UI is functional and polished
- Navigation is intuitive
- Performance is maintained
- User experience is smooth
### Checklist
- [ ] Player controller created
- [ ] Interaction system implemented
- [ ] Interactable objects working
- [ ] UI widgets created
- [ ] Teleport system working
- [ ] Navigation system functional
- [ ] All interactions tested
- [ ] UI polished
- [ ] Performance validated
---
## M10: Cinematic Complete (Day 71)
### Deliverables
- ✅ 6-12 cinematic sequences
- ✅ Master cinematic sequence
- ✅ Movie Render Queue presets (8K EXR, 4K MP4)
- ✅ Performance optimizations
- ✅ LOD system complete
- ✅ World Partition streaming optimized
- ✅ 45-60 second 8K cinematic trailer
### Success Criteria
- Cinematic renders at 8K successfully
- Playable demo runs at 60-90 FPS
- All optimizations implemented
- Visual quality maintained
- Trailer is production-ready
### Checklist
- [ ] 6-12 cinematic sequences created
- [ ] Master sequence assembled
- [ ] MRQ presets configured
- [ ] 8K EXR render successful
- [ ] Performance optimizations complete
- [ ] LOD system validated
- [ ] Streaming optimized
- [ ] 8K cinematic trailer rendered
- [ ] Trailer reviewed and approved
---
## M11: Final Delivery (Day 90)
### Deliverables
- ✅ Comprehensive testing completed
- ✅ Audio integrated (ambient, vehicles, footsteps, music)
- ✅ Final build packaged (Windows)
- ✅ Pixel Streaming setup (optional)
- ✅ VR stub (optional)
- ✅ Complete documentation
- ✅ Developer handoff kit
### Success Criteria
- All systems tested and working
- Build packages successfully
- Documentation is complete
- Ready for delivery
- Meets all quality standards
### Checklist
- [ ] Testing checklist completed
- [ ] All bugs fixed
- [ ] Audio integrated
- [ ] Final game mode configured
- [ ] Windows build packaged
- [ ] Pixel Streaming setup (optional)
- [ ] VR stub created (optional)
- [ ] Documentation complete
- [ ] Developer handoff kit prepared
- [ ] Final review completed
- [ ] Delivery approved
---
## Progress Tracking
### Weekly Reviews
- **Week 1**: M1 status review
- **Week 2**: M2 status review
- **Week 3**: M3 status review
- **Week 4**: M4 status review
- **Week 5**: M5 status review
- **Week 6**: M6 status review
- **Week 7**: M7 status review
- **Week 8**: M8 status review
- **Week 9**: M9 status review
- **Week 10**: M10 status review
- **Week 11-12**: M11 status review
### Risk Assessment
- **Green**: On track, no issues
- **Yellow**: Minor delays, manageable
- **Red**: Significant delays, action required
---
**Version**: 1.0
**Last Updated**: [Current Date]
**Next Review**: [Weekly]