436 lines
10 KiB
Markdown
436 lines
10 KiB
Markdown
|
|
# Milestones - Dubai Metaverse
|
||
|
|
|
||
|
|
## Overview
|
||
|
|
|
||
|
|
This document tracks all project milestones, deliverables, and success criteria for the 90-day Dubai Metaverse production plan.
|
||
|
|
|
||
|
|
## Milestone Summary
|
||
|
|
|
||
|
|
| Milestone | Target Date | Phase | Status |
|
||
|
|
|-----------|-------------|-------|--------|
|
||
|
|
| M1: Project Setup | Day 7 | Phase 1 | ⏳ Pending |
|
||
|
|
| M2: Blockout Complete | Day 15 | Phase 1 | ⏳ Pending |
|
||
|
|
| M3: Procedural Generation | Day 22 | Phase 2 | ⏳ Pending |
|
||
|
|
| M4: Hero Asset Complete | Day 29 | Phase 2 | ⏳ Pending |
|
||
|
|
| M5: Architecture Complete | Day 36 | Phase 2 | ⏳ Pending |
|
||
|
|
| M6: Lighting Complete | Day 43 | Phase 3 | ⏳ Pending |
|
||
|
|
| M7: Vehicles & Water | Day 50 | Phase 3 | ⏳ Pending |
|
||
|
|
| M8: NPCs Complete | Day 57 | Phase 3 | ⏳ Pending |
|
||
|
|
| M9: Interactions Complete | Day 64 | Phase 4 | ⏳ Pending |
|
||
|
|
| M10: Cinematic Complete | Day 71 | Phase 4 | ⏳ Pending |
|
||
|
|
| M11: Final Delivery | Day 90 | Phase 5 | ⏳ Pending |
|
||
|
|
|
||
|
|
**Status Legend**:
|
||
|
|
- ✅ Complete
|
||
|
|
- 🟡 In Progress
|
||
|
|
- ⏳ Pending
|
||
|
|
- ❌ Blocked
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M1: Project Setup (Day 7)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ Project charter and technical brief
|
||
|
|
- ✅ Art bible and visual style guide
|
||
|
|
- ✅ District selection (Dubai Marina + Cayan Tower)
|
||
|
|
- ✅ Unreal Engine 5.4 project initialized
|
||
|
|
- ✅ Version control configured (Git LFS)
|
||
|
|
- ✅ Project folder structure created
|
||
|
|
- ✅ Naming conventions established
|
||
|
|
- ✅ Essential plugins installed
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- All documentation complete and reviewed
|
||
|
|
- UE5 project ready for asset import
|
||
|
|
- Version control working correctly
|
||
|
|
- Team can begin work immediately
|
||
|
|
- No blocking issues
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] README.md created
|
||
|
|
- [ ] PROJECT_CHARTER.md created
|
||
|
|
- [ ] TECHNICAL_BRIEF.md created
|
||
|
|
- [ ] ART_BIBLE.md created
|
||
|
|
- [ ] DISTRICT_SELECTION.md created
|
||
|
|
- [ ] PROJECT_PLAN.md created
|
||
|
|
- [ ] PIPELINE.md created
|
||
|
|
- [ ] NAMING_CONVENTIONS.md created
|
||
|
|
- [ ] UE5_SETUP.md created
|
||
|
|
- [ ] PROJECT_SETTINGS.md created
|
||
|
|
- [ ] PLUGINS.md created
|
||
|
|
- [ ] VERSION_CONTROL.md created
|
||
|
|
- [ ] MILESTONES.md created (this file)
|
||
|
|
- [ ] .gitignore created
|
||
|
|
- [ ] .gitattributes created
|
||
|
|
- [ ] UE5 project created and configured
|
||
|
|
- [ ] Git LFS initialized
|
||
|
|
- [ ] Plugins installed and verified
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M2: Blockout Complete (Day 15)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ OpenStreetMap data imported
|
||
|
|
- ✅ GIS/DEM terrain data processed
|
||
|
|
- ✅ Playable graybox level
|
||
|
|
- ✅ Accurate building footprints
|
||
|
|
- ✅ Road network established
|
||
|
|
- ✅ Asset list (Tier 1, 2, 3)
|
||
|
|
- ✅ Blockout review completed
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- Blockout accurately represents Dubai Marina
|
||
|
|
- Scale is 1:1 and validated
|
||
|
|
- Navigation flow is logical
|
||
|
|
- Asset list is comprehensive
|
||
|
|
- Layout approved by stakeholders
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] OpenStreetMap data imported
|
||
|
|
- [ ] Terrain generated from elevation data
|
||
|
|
- [ ] Building footprints created
|
||
|
|
- [ ] Road network established
|
||
|
|
- [ ] Graybox level playable
|
||
|
|
- [ ] Scale validated (1:1)
|
||
|
|
- [ ] Navigation flow tested
|
||
|
|
- [ ] Asset list created (Tier 1, 2, 3)
|
||
|
|
- [ ] Blockout review completed
|
||
|
|
- [ ] Stakeholder approval received
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M3: Procedural Generation (Day 22)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ PCG graphs for building placement
|
||
|
|
- ✅ PCG graphs for road props
|
||
|
|
- ✅ PCG graphs for vegetation
|
||
|
|
- ✅ Houdini HDAs for building generation
|
||
|
|
- ✅ Populated blockout (60-70% proxy buildings)
|
||
|
|
- ✅ Procedural workflow documented
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- Blockout fully populated procedurally
|
||
|
|
- 60-70% of buildings represented
|
||
|
|
- Procedural system is reusable
|
||
|
|
- Performance is acceptable
|
||
|
|
- Workflow is documented
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] PCG building placement graph created
|
||
|
|
- [ ] PCG road props graph created
|
||
|
|
- [ ] PCG vegetation graph created
|
||
|
|
- [ ] Houdini building generator HDA created
|
||
|
|
- [ ] Blockout populated with procedural content
|
||
|
|
- [ ] 60-70% buildings represented
|
||
|
|
- [ ] Performance tested and acceptable
|
||
|
|
- [ ] Procedural workflow documented
|
||
|
|
- [ ] PCG graphs validated
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M4: Hero Asset Complete (Day 29)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ Cayan Tower high-poly model
|
||
|
|
- ✅ 8K texture sets (UDIM workflow)
|
||
|
|
- ✅ Nanite static mesh
|
||
|
|
- ✅ PBR materials (glass, chrome, etc.)
|
||
|
|
- ✅ Hero asset imported to UE5
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- Hero asset is photoreal quality
|
||
|
|
- 8K textures are properly applied
|
||
|
|
- Nanite mesh renders correctly
|
||
|
|
- Materials match reference
|
||
|
|
- Visual quality meets standards
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] Cayan Tower high-poly model complete
|
||
|
|
- [ ] 8K texture sets created (UDIM)
|
||
|
|
- [ ] Materials created (glass, chrome, etc.)
|
||
|
|
- [ ] Nanite mesh imported to UE5
|
||
|
|
- [ ] Materials assigned correctly
|
||
|
|
- [ ] Visual quality validated
|
||
|
|
- [ ] Performance tested
|
||
|
|
- [ ] Reference comparison completed
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M5: Architecture Complete (Day 36)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ 20-40 primary buildings modeled
|
||
|
|
- ✅ Dubai architecture material library
|
||
|
|
- ✅ 4K texture sets for buildings
|
||
|
|
- ✅ Shader variations (dust, fingerprints, weathering)
|
||
|
|
- ✅ Global decal pass
|
||
|
|
- ✅ 70-80% buildings at production detail
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- 70-80% buildings complete
|
||
|
|
- Material library is comprehensive
|
||
|
|
- Textures are production quality
|
||
|
|
- Performance is maintained
|
||
|
|
- Visual consistency achieved
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] 20-40 primary buildings modeled
|
||
|
|
- [ ] Material library created
|
||
|
|
- [ ] 4K textures applied
|
||
|
|
- [ ] Shader variations created
|
||
|
|
- [ ] Global decals applied
|
||
|
|
- [ ] 70-80% buildings at production detail
|
||
|
|
- [ ] Performance validated
|
||
|
|
- [ ] Visual consistency checked
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M6: Lighting Complete (Day 43)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ HDRI sky setup
|
||
|
|
- ✅ Day/night cycle system
|
||
|
|
- ✅ Volumetric fog and atmosphere
|
||
|
|
- ✅ Heat haze shader
|
||
|
|
- ✅ Post-process volume
|
||
|
|
- ✅ Sunrise to sunset cycle working
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- Lighting matches Dubai aesthetic
|
||
|
|
- Day/night cycle transitions smoothly
|
||
|
|
- Performance is acceptable
|
||
|
|
- Visual quality is cinematic
|
||
|
|
- Atmosphere is realistic
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] HDRI sky configured
|
||
|
|
- [ ] Directional light with day/night cycle
|
||
|
|
- [ ] Lumen GI and reflections working
|
||
|
|
- [ ] Volumetric fog configured
|
||
|
|
- [ ] Heat haze shader created
|
||
|
|
- [ ] Post-process volume configured
|
||
|
|
- [ ] Day/night cycle tested
|
||
|
|
- [ ] Performance validated
|
||
|
|
- [ ] Visual quality approved
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M7: Vehicles & Water (Day 50)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ Dubai supercars (Lamborghini, G-Wagon, Ferrari)
|
||
|
|
- ✅ Chaos vehicle system working
|
||
|
|
- ✅ Marina water shader with reflections
|
||
|
|
- ✅ Particle effects (dust, heat, sand, fountains)
|
||
|
|
- ✅ AI traffic spline system
|
||
|
|
- ✅ Drivable vehicle
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- Vehicles drive realistically
|
||
|
|
- Water looks photoreal
|
||
|
|
- Particle effects enhance atmosphere
|
||
|
|
- Performance is maintained
|
||
|
|
- All systems functional
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] Supercar models imported/created
|
||
|
|
- [ ] Chaos vehicle system configured
|
||
|
|
- [ ] Vehicle controller working
|
||
|
|
- [ ] Marina water shader created
|
||
|
|
- [ ] Particle effects created
|
||
|
|
- [ ] AI traffic system working
|
||
|
|
- [ ] Vehicles drivable and tested
|
||
|
|
- [ ] Water simulation validated
|
||
|
|
- [ ] Performance tested
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M8: NPCs Complete (Day 57)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ 5-10 MetaHumans created
|
||
|
|
- ✅ Animation sets (walking, sitting, phone, gestures)
|
||
|
|
- ✅ Behavior trees for NPCs
|
||
|
|
- ✅ NPC AI controller
|
||
|
|
- ✅ ChatGPT integration (optional)
|
||
|
|
- ✅ NPCs populating district
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- NPCs look realistic
|
||
|
|
- Behavior is natural
|
||
|
|
- Performance is acceptable
|
||
|
|
- Dialogue system works (if implemented)
|
||
|
|
- District feels alive
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] 5-10 MetaHumans created
|
||
|
|
- [ ] Animations imported/created
|
||
|
|
- [ ] Behavior trees created
|
||
|
|
- [ ] NPC controller working
|
||
|
|
- [ ] ChatGPT integration (optional)
|
||
|
|
- [ ] NPCs placed in level
|
||
|
|
- [ ] Behavior tested
|
||
|
|
- [ ] Performance validated
|
||
|
|
- [ ] Visual quality approved
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M9: Interactions Complete (Day 64)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ Player controller (first/third-person)
|
||
|
|
- ✅ Interaction system framework
|
||
|
|
- ✅ Interactable objects (doors, holograms, info panels, elevators)
|
||
|
|
- ✅ UI widgets (main menu, mini-map, interaction prompts)
|
||
|
|
- ✅ Teleport/fast travel system
|
||
|
|
- ✅ Simple quest/navigation system
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- All interactions work correctly
|
||
|
|
- UI is functional and polished
|
||
|
|
- Navigation is intuitive
|
||
|
|
- Performance is maintained
|
||
|
|
- User experience is smooth
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] Player controller created
|
||
|
|
- [ ] Interaction system implemented
|
||
|
|
- [ ] Interactable objects working
|
||
|
|
- [ ] UI widgets created
|
||
|
|
- [ ] Teleport system working
|
||
|
|
- [ ] Navigation system functional
|
||
|
|
- [ ] All interactions tested
|
||
|
|
- [ ] UI polished
|
||
|
|
- [ ] Performance validated
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M10: Cinematic Complete (Day 71)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ 6-12 cinematic sequences
|
||
|
|
- ✅ Master cinematic sequence
|
||
|
|
- ✅ Movie Render Queue presets (8K EXR, 4K MP4)
|
||
|
|
- ✅ Performance optimizations
|
||
|
|
- ✅ LOD system complete
|
||
|
|
- ✅ World Partition streaming optimized
|
||
|
|
- ✅ 45-60 second 8K cinematic trailer
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- Cinematic renders at 8K successfully
|
||
|
|
- Playable demo runs at 60-90 FPS
|
||
|
|
- All optimizations implemented
|
||
|
|
- Visual quality maintained
|
||
|
|
- Trailer is production-ready
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] 6-12 cinematic sequences created
|
||
|
|
- [ ] Master sequence assembled
|
||
|
|
- [ ] MRQ presets configured
|
||
|
|
- [ ] 8K EXR render successful
|
||
|
|
- [ ] Performance optimizations complete
|
||
|
|
- [ ] LOD system validated
|
||
|
|
- [ ] Streaming optimized
|
||
|
|
- [ ] 8K cinematic trailer rendered
|
||
|
|
- [ ] Trailer reviewed and approved
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## M11: Final Delivery (Day 90)
|
||
|
|
|
||
|
|
### Deliverables
|
||
|
|
|
||
|
|
- ✅ Comprehensive testing completed
|
||
|
|
- ✅ Audio integrated (ambient, vehicles, footsteps, music)
|
||
|
|
- ✅ Final build packaged (Windows)
|
||
|
|
- ✅ Pixel Streaming setup (optional)
|
||
|
|
- ✅ VR stub (optional)
|
||
|
|
- ✅ Complete documentation
|
||
|
|
- ✅ Developer handoff kit
|
||
|
|
|
||
|
|
### Success Criteria
|
||
|
|
|
||
|
|
- All systems tested and working
|
||
|
|
- Build packages successfully
|
||
|
|
- Documentation is complete
|
||
|
|
- Ready for delivery
|
||
|
|
- Meets all quality standards
|
||
|
|
|
||
|
|
### Checklist
|
||
|
|
|
||
|
|
- [ ] Testing checklist completed
|
||
|
|
- [ ] All bugs fixed
|
||
|
|
- [ ] Audio integrated
|
||
|
|
- [ ] Final game mode configured
|
||
|
|
- [ ] Windows build packaged
|
||
|
|
- [ ] Pixel Streaming setup (optional)
|
||
|
|
- [ ] VR stub created (optional)
|
||
|
|
- [ ] Documentation complete
|
||
|
|
- [ ] Developer handoff kit prepared
|
||
|
|
- [ ] Final review completed
|
||
|
|
- [ ] Delivery approved
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Progress Tracking
|
||
|
|
|
||
|
|
### Weekly Reviews
|
||
|
|
|
||
|
|
- **Week 1**: M1 status review
|
||
|
|
- **Week 2**: M2 status review
|
||
|
|
- **Week 3**: M3 status review
|
||
|
|
- **Week 4**: M4 status review
|
||
|
|
- **Week 5**: M5 status review
|
||
|
|
- **Week 6**: M6 status review
|
||
|
|
- **Week 7**: M7 status review
|
||
|
|
- **Week 8**: M8 status review
|
||
|
|
- **Week 9**: M9 status review
|
||
|
|
- **Week 10**: M10 status review
|
||
|
|
- **Week 11-12**: M11 status review
|
||
|
|
|
||
|
|
### Risk Assessment
|
||
|
|
|
||
|
|
- **Green**: On track, no issues
|
||
|
|
- **Yellow**: Minor delays, manageable
|
||
|
|
- **Red**: Significant delays, action required
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
**Version**: 1.0
|
||
|
|
**Last Updated**: [Current Date]
|
||
|
|
**Next Review**: [Weekly]
|
||
|
|
|