3.3 KiB
3.3 KiB
Blockout Review - Dubai Metaverse
Review Date
[Date of Review]
Reviewers
- [Reviewer 1]
- [Reviewer 2]
- [Reviewer 3]
Blockout Status
Status: [Pending Review / Approved / Needs Revision]
Layout Validation
Scale Verification
- Scale is 1:1 (verified)
- Building heights are accurate
- Road widths are accurate
- Distances match real-world
Notes: [Notes on scale validation]
Building Placement
- Cayan Tower placed correctly
- Marina Towers placed correctly
- Primary buildings placed correctly
- Building footprints match reference
- Building spacing is realistic
Notes: [Notes on building placement]
Road Network
- Road layout matches reference
- Road widths are correct
- Intersections are properly configured
- Sidewalks are included
- Road markings are planned
Notes: [Notes on road network]
Marina Area
- Marina water area defined
- Marina dimensions are accurate
- Dock/pier locations are correct
- Yacht areas are planned
Notes: [Notes on marina area]
Navigation Flow
Player Movement
- Navigation paths are logical
- No dead ends or blocked areas
- Key areas are accessible
- Flow feels natural
Notes: [Notes on navigation]
Key Points of Interest
- Cayan Tower is accessible
- Marina promenade is accessible
- Key viewpoints are identified
- Interaction points are planned
Notes: [Notes on points of interest]
Asset Requirements
Tier 1: Hero Assets
- Cayan Tower identified
- Specifications documented
- Reference materials collected
Notes: [Notes on hero assets]
Tier 2: Primary Buildings
- 20-40 buildings identified
- Building types categorized
- Priority order established
- Specifications documented
Notes: [Notes on primary buildings]
Tier 3: Background Buildings
- Background buildings planned
- Procedural generation approach defined
- LOD strategy planned
Notes: [Notes on background buildings]
Technical Validation
Performance
- Blockout performance is acceptable
- No performance issues identified
- Optimization strategy planned
Notes: [Notes on performance]
World Partition
- World Partition configured
- Cell sizes are appropriate
- Streaming strategy planned
Notes: [Notes on World Partition]
Feedback & Action Items
Critical Issues
-
[Issue 1]
- Action: [Action required]
- Assigned to: [Person]
- Due Date: [Date]
-
[Issue 2]
- Action: [Action required]
- Assigned to: [Person]
- Due Date: [Date]
High-Priority Issues
- [Issue 1]
- Action: [Action required]
- Assigned to: [Person]
- Due Date: [Date]
Medium-Priority Issues
- [Issue 1]
- Action: [Action required]
- Assigned to: [Person]
- Due Date: [Date]
Approval
Stakeholder Approval
- Art Director: [Name] - [Approved / Needs Revision]
- Technical Director: [Name] - [Approved / Needs Revision]
- Project Lead: [Name] - [Approved / Needs Revision]
Overall Status: [Approved / Needs Revision]
Next Steps: [Next steps after review]
Version: 1.0 Last Updated: [Current Date]