Files
proxmox/docs/03-deployment/PHASE_D_OPTIONAL_CHECKLIST.md

51 lines
2.1 KiB
Markdown
Raw Normal View History

# Phase D — Optional Extended Coverage Checklist
**Last Updated:** 2026-03-04
**Purpose:** Checklist for Phase D of [REMAINING_DEPLOYMENTS_FOR_FULL_NETWORK_COVERAGE.md](REMAINING_DEPLOYMENTS_FOR_FULL_NETWORK_COVERAGE.md): XAU, vaults, ALL Mainnet, and trustless stack.
---
## D.1 XAU token + XAU-anchored pools (Chain 138)
| Step | Action | Ref |
|------|--------|-----|
| D.1.1 | Deploy XAU token on Chain 138 (or use oracle-backed representation). | [LIQUIDITY_POOLS_MASTER_MAP](../11-references/LIQUIDITY_POOLS_MASTER_MAP.md) §2, §5 |
| D.1.2 | Create cUSDT/XAU, cUSDC/XAU, cEURT/XAU PMM pools (public and/or private stabilization). | [VAULT_SYSTEM_MASTER_TECHNICAL_PLAN](../02-architecture/VAULT_SYSTEM_MASTER_TECHNICAL_PLAN.md) |
| D.1.3 | Register private stabilization pools in PrivatePoolRegistry; configure Stabilizer. | CONTRACT_DEPLOYMENT_RUNBOOK § Private stabilization pools |
**Env:** `XAU_ADDRESS_138`, `cEURT_ADDRESS_138`, `DODOPMM_INTEGRATION_ADDRESS`.
---
## D.2 Vault ac* / vdc* / sdc* for new base tokens
| Step | Action | Ref |
|------|--------|-----|
| D.2.1 | Deploy vault contracts for cEURC, cEURT, etc. (ac*, vdc*, sdc*). | [TOKEN_CONTRACT_DEPLOYMENTS_REMAINING](../11-references/TOKEN_CONTRACT_DEPLOYMENTS_REMAINING.md) §5 |
| D.2.2 | Wire vaults to reserve/backing and oracle feeds. | VAULT_SYSTEM_MASTER_TECHNICAL_PLAN |
---
## D.3 ALL Mainnet (651940)
| Step | Action | Ref |
|------|--------|-----|
| D.3.1 | ACADT/ACADC when Alltra adds CAD token. | TOKEN_CONTRACT_DEPLOYMENTS_REMAINING §2, §4 |
| D.3.2 | D-WIN W tokens on 138/651940 if desired. | Same |
---
## D.4 Mainnet trustless stack
| Step | Action | Ref |
|------|--------|-----|
| D.4.1 | Deploy LiquidityPoolETH, InboxETH, BondManager on mainnet for trustless bridge liquidity. | [OPTIONAL_DEPLOYMENTS_START_HERE](../07-ccip/OPTIONAL_DEPLOYMENTS_START_HERE.md) §C |
---
## References
- [REMAINING_DEPLOYMENTS_FOR_FULL_NETWORK_COVERAGE.md](REMAINING_DEPLOYMENTS_FOR_FULL_NETWORK_COVERAGE.md) Phase D
- [LIQUIDITY_POOLS_MASTER_MAP](../11-references/LIQUIDITY_POOLS_MASTER_MAP.md)
- [VAULT_SYSTEM_MASTER_TECHNICAL_PLAN](../02-architecture/VAULT_SYSTEM_MASTER_TECHNICAL_PLAN.md)