Phases and Tasks Master Checklist

Last Updated: 2026-02-05
Status: Active Documentation Package Manager: pnpm (run pnpm outdated -r to check dependencies)

For parallel execution: See PARALLEL_TASK_STRUCTURE.md — tasks are grouped by cohort; order of operations does not block parallel completion. Split large tasks into smaller units to maximize automation.

Full plan (required / optional / recommended): COMPLETE_REQUIRED_OPTIONAL_RECOMMENDED_INDEX.md — Wave 0 gates, phases, codebase, operator checklist.


Deployment Phases

Phase 0 — Foundation

Task Required Status Notes
ER605-A WAN1 configured (76.53.10.34/28) Required Done
Proxmox mgmt accessible Required Done
Basic containers deployed (ml110) Required Done 12 Besu containers
R630-03 / R630-04 Obsolete N/A Only ml110, r630-01, r630-02 active

Phase 1 — VLAN Enablement

Task Required Status Notes
UDM Pro VLAN config Optional Pending ES216G/ER605 removed
VLAN-aware bridge on Proxmox Optional Pending
Services migrated to VLANs Optional Pending See NETWORK_ARCHITECTURE

Phase 2 — Observability

Task Required Status Notes
Monitoring stack deployed (Prometheus, Grafana, Loki, Alertmanager) Required Pending
Grafana published via Cloudflare Access Required Pending
Alerts configured Required Pending

Phase 3 — CCIP Fleet

Task Required Status Notes
CCIP Ops/Admin deployed (VMID 5400-5401) Required Pending docs/07-ccip/CCIP_DEPLOYMENT_SPEC
16 commit nodes (5410-5425) Required Pending
16 execute nodes (5440-5455) Required Pending
7 RMN nodes (5470-5476) Required Pending
NAT pools configured Required Pending
25062508 (destroyed 2026-02-08) Done MISSING_CONTAINERS_LIST.md

Phase 4 — Sovereign Tenants

Task Required Status Notes
Sovereign VLANs configured Required Pending
Tenant isolation enforced Required Pending
Access control configured Required Pending

Codebase Tasks

smom-dbis-138 (Required)

Task Priority Status
Vault/ISO test suites Critical Tests exist (test/vault/, test/iso4217w/)
Deployment scripts (VLT-010 to VLT-018, ISO-009 to ISO-018) High deploy-vault-system.sh created
Security audits (VLT-024, ISO-024) Critical Pending
Bridge integrations (BRG-VLT, BRG-ISO) High Pending
CCIP AMB full implementation High Pending

OMNIS (Required)

Task Priority Status
REST API backend Critical Scaffold exists (OMNIS/backend)
Replace MSW mocks with real API Critical VITE_USE_REAL_API toggle exists
Auth (Sankofa Phoenix SDK) High VITE_SANKOFA_* env scaffold added
Database schema and migrations Critical Migrations exist
Unit tests (Header, etc.) High Vitest scaffold; Header.test.tsx passes

dbis_core (Required)

Task Priority Status
AS4 settlement placeholders High SANCTIONS/AML/LEDGER env stubs added
IRU remaining tasks High Pending
TypeScript/Prisma fixes (Phases 1-4 done) High ~1186 errors remain

Infrastructure (Optional)

Task Priority Status
NPMplus HA (Keepalived, secondary) Optional Pending
verify-backend-vms TBD paths (10130, 2400) Optional Resolved; host mapping fixed
WebSocket automated testing Optional Pending

Documentation (Optional)

Task Priority Status
IP centralization (590+ scripts) Optional Tracking doc: IP_CENTRALIZATION_TRACKING.md
Documentation consolidation Optional Pending

External Integrations (Provider-Dependent)

Integration Est. Time Status
Li.Fi 2-8 weeks Pending
LayerZero 4-12 weeks Pending
Wormhole 6-16 weeks Pending
Uniswap 8-20 weeks Pending
1inch 4-12 weeks Pending
MoonPay / Ramp 4-8 weeks each Pending