- Update submodule references for explorer-monorepo and smom-dbis-138 to latest commits. - Modify CI workflow to include shellcheck installation and enforce error severity for script checks. - Update contract addresses in configuration and documentation to reflect the new canonical addresses for CCIPWETH9Bridge and CCIP Router. - Revise integration test documentation to align with updated contract addresses and deployment statuses. Made-with: Cursor
5.5 KiB
Complete Required, Optional, and Recommended — Index
Purpose: Single entry point for the full execution plan (required, optional, and recommended work). Execution order: Wave 0 → Wave 1 → Wave 2 → Wave 3 → Ongoing.
Sources: PHASES_AND_TASKS_MASTER.md, TODO_TASK_LIST_MASTER.md, ALL_RECOMMENDATIONS_AND_IMPROVEMENTS_LIST.md, REMAINING_WORK_DETAILED_STEPS.md, FULL_PARALLEL_EXECUTION_ORDER.md.
Wave 0 — Gates (do first when creds allow)
| Task | Blocker | Command / doc |
|---|---|---|
| W0-1 NPMplus RPC fix (405) | Host on LAN (192.168.11.x) | REMAINING_WORK_DETAILED_STEPS.md § W0-1. bash scripts/run-wave0-from-lan.sh or bash scripts/nginx-proxy-manager/update-npmplus-proxy-hosts-api.sh. |
| W0-2 sendCrossChain (real) | PRIVATE_KEY, LINK approved | REMAINING_WORK_DETAILED_STEPS.md § W0-2. bash scripts/bridge/run-send-cross-chain.sh <amount> [recipient]. Bridge: 0xcacfd227A040002e49e2e01626363071324f820a. |
| W0-3 NPMplus backup | NPM_PASSWORD in .env | REMAINING_WORK_DETAILED_STEPS.md § W0-3. bash scripts/verify/backup-npmplus.sh or scripts/run-wave0-from-lan.sh. |
Required work
- Deployment phases: PHASES_AND_TASKS_MASTER.md — Phase 2 (observability), Phase 3 (CCIP fleet), Phase 4 (sovereign tenants). Runbooks: OPERATIONAL_RUNBOOKS.md.
- Codebase: smom audits (VLT-024, ISO-024), bridge integrations (BRG-VLT, BRG-ISO); dbis_core IRU + DBIS_CORE_TS_FIXES_DETAILED_LIST.md; OMNIS per PHASES_AND_TASKS_MASTER.
- Security & verification: RECOMMENDATIONS_OPERATOR_CHECKLIST.md R1–R24; REMAINING_WORK_DETAILED_STEPS.md § W1-1, W1-2.
Optional work
- Checklist: OPTIONAL_TASKS_CHECKLIST.md — consolidated optional tasks (Done / Pending / Operator-only).
- Infrastructure: Phase 1 VLAN, NPMplus HA. (2506–2508 destroyed 2026-02-08; RPC 2500–2505 only.) OPTIONAL_RECOMMENDATIONS_INDEX.md, MISSING_CONTAINERS_LIST.md, NPMPLUS_HA_SETUP_GUIDE.md.
- Docs/tooling: Documentation consolidation; Paymaster deploy when ready.
- MetaMask/explorer: Token-aggregation, CoinGecko, Snap features, explorer enhancements; Wallet link runbook: EXPLORER_WALLET_LINK_QUICK_WIN.md. COINGECKO_SUBMISSION.md.
Recommended work (139+ items)
- Full list: ALL_RECOMMENDATIONS_AND_IMPROVEMENTS_LIST.md (20 sections).
- High priority only: ALL_RECOMMENDATIONS_HIGH_PRIORITY.md.
- Operator-only (LAN/creds/external): OPERATOR_AND_EXTERNAL_COMPLETION_CHECKLIST.md.
- Parallel order: FULL_PARALLEL_EXECUTION_ORDER.md.
Execution order summary
- Wave 0: W0-1, W0-2, W0-3 when LAN/creds available.
- Wave 1 (parallel): REMAINING_WORK_DETAILED_STEPS.md "Can Be Accomplished Now"; validation:
bash scripts/verify/run-all-validation.sh [--skip-genesis],scripts/validation/validate-config-files.sh. - Wave 2 / Wave 3: WAVE2_WAVE3_OPERATOR_CHECKLIST.md.
- Ongoing: Maintenance 135–139;
schedule-daily-weekly-cron.sh --install.
Fixes status (in-repo)
All required fixes in REQUIRED_FIXES_UPDATES_GAPS.md §§1–6 are Done or Documented. Placeholders (canonical addresses, AlltraAdapter, smart accounts, quote FABRIC_CHAIN_ID, .bak) are complete per that doc. Remaining work: operator/LAN tasks, deferred dbis_core TS (~1186), and external (audits, Ledger, CoinGecko).
Still not done — execution checklist: STILL_NOT_DONE_EXECUTION_CHECKLIST.md — copy-paste commands and links for every operator/LAN, dbis_core TS, security-audit, external, and maintenance item.
Key references
| Purpose | Document |
|---|---|
| Step-by-step for every task | REMAINING_WORK_DETAILED_STEPS.md |
| Copy-paste operator runbook | NEXT_STEPS_OPERATOR.md |
| Master task list | TODO_TASK_LIST_MASTER.md |
| Required fixes (all Done/Documented) | REQUIRED_FIXES_UPDATES_GAPS.md |
| Still not done (operator/external/TS) | STILL_NOT_DONE_EXECUTION_CHECKLIST.md |
| Breakdown: missing info per task | REMAINING_TASKS_BREAKDOWN_MISSING_INFO.md |
| dbis_core TS fixes (deferred) | DBIS_CORE_TS_FIXES_DETAILED_LIST.md |
| DBIS Rail + project completion (status and full task list, required + optional) | DBIS_RAIL_AND_PROJECT_COMPLETION_MASTER_V1.md |