- ADD_CHAIN138_TO_LEDGER_LIVE: Ledger form done; public code review repo bis-innovations/LedgerLive; init/push commands - CONTRACT_DEPLOYMENT_RUNBOOK: Chain 138 gas price 1 gwei, 36-addr check, TransactionMirror workaround - CONTRACT_*: AddressMapper, MirrorManager deployed 2026-02-12; 36-address on-chain check - NEXT_STEPS_FOR_YOU: Ledger done; steps completable now (no LAN); run-completable-tasks-from-anywhere - MASTER_INDEX, OPERATOR_OPTIONAL, SMART_CONTRACTS_INVENTORY_SIMPLE: updates - LEDGER_BLOCKCHAIN_INTEGRATION_COMPLETE: bis-innovations/LedgerLive reference Co-authored-by: Cursor <cursoragent@cursor.com>
3.9 KiB
3.9 KiB
T1.2 Bridge Resolution - Complete Execution Summary
Last Updated: 2026-01-31
Document Version: 1.0
Status: Active Documentation
Date: 2026-01-18
Status: ✅ PHASE 1 & 2 COMPLETE | 📋 PHASE 3 READY FOR EXECUTION
🎯 Objective
Resolve ChainID 138 bridge interface issue by deploying updated contracts with full interface (addDestination(), getDestinationChains()).
Goal: Enable bidirectional bridge configuration (ChainID 138 ↔ Mainnet)
✅ Completed Tasks
Phase 1: Verify Current State ✅
- ✅ Task 1.1: Test bridge functionality analysis
- ✅ Task 1.2: Event log verification (no events found)
- Result: Confirmed missing functions, no destinations configured
Phase 2: Decision ✅
- ✅ Selected Option A: Contract Upgrade/Update
- Rationale: Full functionality, long-term solution, matches Mainnet interface
Phase 3: Implementation Preparation ✅
- ✅ Task 3.1: State extraction complete
- ✅ Task 3.3: Migration planning complete
Extracted State:
- Admin:
0x4A666F96fC8764181194447A7dFdb7d471b301C8 - CCIP Router:
0x99b3511a2d315a497c8112c1fdd8d508d4b1e506 - WETH9:
0xC02aaA39b223FE8D0A0e5C4F27eAD9083C756Cc2 - WETH10:
0xf4BB2e28688e89fCcE3c0580D37d36A7672E8A9f - LINK (expected):
0x514910771AF9Ca656af840dff83E8264EcF986CA
📋 Remaining Tasks (Phase 3)
Task 3.2: Deploy New Contracts
Status: ⏳ AWAITING EXECUTION
- Requires: Admin private key, Foundry, RPC access
- Action: Deploy WETH9 and WETH10 bridges with full interface
- See:
T1_2_PHASE3_EXECUTION_PLAN.mdfor detailed steps
Task 3.4: Configure Destinations
Status: ⏳ AWAITING DEPLOYMENT
- Action: Add Mainnet as destination on both new bridges
- Command examples in execution plan
Task 3.5: Test Bidirectional
Status: ⏳ AWAITING CONFIGURATION
- Action: Test transfers in both directions
Task 3.6: Update References
Status: ⏳ AWAITING NEW ADDRESSES
- Action: Update all documentation, scripts, integrations
📄 Documentation Created
- ✅
T1_2_BRIDGE_RESOLUTION_TASKS_DETAILED.md- Complete task breakdown - ✅
T1_2_PHASE1_COMPLETE_SUMMARY.md- Phase 1 results - ✅
T1_2_PHASE3_EXECUTION_PLAN.md- Deployment instructions - ✅
T1_2_BRIDGE_RESOLUTION_EXECUTION_SUMMARY.md- This document
🔧 Scripts Created
- ✅
scripts/phase1-check-bridge-event-logs.sh- Event verification - ✅
scripts/phase1-test-bridge-transfer.sh- Transfer testing - ✅
scripts/phase3-extract-bridge-state.sh- State extraction
🚀 Next Steps
- Review Execution Plan:
docs/06-besu/T1_2_PHASE3_EXECUTION_PLAN.md - Prepare Environment: Set PRIVATE_KEY, verify RPC access
- Deploy Contracts: Execute Phase 3.2 deployment steps
- Configure & Test: Complete remaining Phase 3 tasks
- Update Documentation: Record new bridge addresses
📊 Current Status
| Phase | Status | Completion |
|---|---|---|
| Phase 1: Verify State | ✅ Complete | 100% |
| Phase 2: Decision | ✅ Complete | 100% |
| Phase 3.1: Prepare Deployment | ✅ Complete | 100% |
| Phase 3.2: Deploy Contracts | ⏳ Pending | 0% |
| Phase 3.3: Migrate State | ✅ Complete | 100% |
| Phase 3.4: Configure | ⏳ Pending | 0% |
| Phase 3.5: Test | ⏳ Pending | 0% |
| Phase 3.6: Update Docs | ⏳ Pending | 0% |
Overall Progress: ~50% (Preparation complete, deployment pending)
⚠️ Important Notes
- Router Verification: Verify router address
0x99b3511a2d315a497c8112c1fdd8d508d4b1e506is correct CCIP router - LINK Token: Verify LINK address
0x514910771AF9Ca656af840dff83E8264EcF986CAis correct - Old Contracts: Old bridge addresses cannot be changed (immutable), new addresses will be used
- Breaking Change: All integrations must update to new bridge addresses after deployment
Status: ✅ PREPARATION COMPLETE - READY FOR DEPLOYMENT