Files
proxmox/docs/bridge/trustless/audit/audit-request-template.md
defiQUG cb47cce074 Complete markdown files cleanup and organization
- Organized 252 files across project
- Root directory: 187 → 2 files (98.9% reduction)
- Moved configuration guides to docs/04-configuration/
- Moved troubleshooting guides to docs/09-troubleshooting/
- Moved quick start guides to docs/01-getting-started/
- Moved reports to reports/ directory
- Archived temporary files
- Generated comprehensive reports and documentation
- Created maintenance scripts and guides

All files organized according to established standards.
2026-01-06 01:46:25 -08:00

1.9 KiB

Security Audit Request

Project Information

Project Name: Trustless Bridge System Network: ChainID 138 (Besu) ↔ Ethereum Mainnet Audit Type: Smart Contract Security Audit Priority: High

Scope

Contracts to Audit

  1. Lockbox138 (ChainID 138)

    • Deposit contract
    • Replay protection
    • Deposit ID generation
  2. InboxETH (Ethereum Mainnet)

    • Claim submission
    • Rate limiting
    • Relayer fees
    • Batch operations
  3. BondManager (Ethereum Mainnet)

    • Bond posting
    • Bond slashing
    • Bond release
    • Batch operations
  4. ChallengeManager (Ethereum Mainnet)

    • Fraud proof verification
    • Challenge mechanism
    • Finalization logic
    • Batch operations
  5. LiquidityPoolETH (Ethereum Mainnet)

    • Liquidity management
    • Fee distribution
    • Minimum ratio enforcement
  6. SwapRouter (Ethereum Mainnet)

    • DEX integration
    • Slippage protection
    • Route validation
  7. BridgeSwapCoordinator (Ethereum Mainnet)

    • Bridge + swap coordination
    • Claim verification
  8. Libraries

    • MerkleProofVerifier
    • FraudProofTypes

Focus Areas

  1. Economic Security Model

    • Bond sizing calculations
    • Slashing mechanics
    • Economic attack scenarios
  2. Fraud Proof Implementation

    • Merkle proof verification
    • Fraud proof types
    • Verification logic
  3. Access Control

    • Admin functions
    • Authorization mechanisms
    • Multisig integration
  4. Rate Limiting

    • Cooldown mechanisms
    • Hourly limits
    • Spam prevention
  5. Batch Operations

    • Gas efficiency
    • Error handling
    • Reentrancy protection

Deliverables

  • Comprehensive audit report
  • Risk assessment
  • Recommendations
  • Fix prioritization

Timeline

  • Request Date: [DATE]
  • Proposed Start: [DATE]
  • Expected Completion: [DATE]
  • Remediation Period: 2-4 weeks

Contact

[Your Contact Information]