Some checks failed
Deploy to Phoenix / deploy (push) Has been cancelled
- Add OMNL/CBK Indonesia submission and audit binder docs, manifests, attestations - Add scripts/omnl transaction-package pipeline, LEI/PvP helpers, jq/lib fixtures - Update entity master data, MASTER_INDEX, TODOS, dbis-rail docs and rulebook - Add proof_package/regulatory skeleton and transaction package zip + snapshot JSON - validate-omnl-rail workflow, forge-verification-proxy tweak, .gitignore hygiene - Bump smom-dbis-138 (cronos verify docs/scripts) and explorer-monorepo (SPA + env report) Made-with: Cursor
795 B
795 B
documentId, settlementRef, targetScore, version
| documentId | settlementRef | targetScore | version |
|---|---|---|---|
| MOF-ALIGNMENT-MEMO-HYBX-BATCH-001 | HYBX-BATCH-001 | 4.995 | 1.0 |
MoF Alignment Memo — HYBX-BATCH-001
1. Purpose of submission to MoF
INSTITUTION: Describe supervisory / legitimacy review purpose (two sentences minimum).
2. Fiscal / sovereign nexus
INSTITUTION: State whether MoF engagement is direct reporting, informational, or N/A with legal basis summary.
3. Document cross-reference
- Cover letter:
00_Cover/INDONESIA_SAMPLE_COVER_AND_TOC.md - Master manifest:
Appendix/INDONESIA_MASTER_PROOF_MANIFEST.md
4. Sign-off (required for 4.995)
Electronic signature or PDF hash recorded in SUBREG.
| Role | Name | Date UTC |
|---|---|---|
| Authorised MoF liaison / Legal |