Files
proxmox/mission-control/TIMELINE.md
TorNation01 18767b7d8b feat: add Mission Control operator console and workspace wiring
- New mission-control Next.js app: runbook catalog, GO execution, SSE stream, audit ZIP export

- Generated doc-manifest from docs runbooks; curated JSON specs; health-check script

- pnpm workspace package, root scripts, README updates

- Resilience: Windows-safe path checks, optional MISSION_CONTROL_PROJECT_ROOT fallback, system fonts

- Bump mcp-proxmox submodule to tracked main

Made-with: Cursor
2026-03-28 14:50:11 +08:00

1.2 KiB
Raw Blame History

Mission Control — delivery timeline

Estimates assume one engineer familiar with the monorepo. Parallel work (UI + runner hardening) can compress calendar time.

Phase Scope Estimate Status (this PR)
P0 Workspace package, routing, TARDIS-themed shell, launchpad links 12 days Done
P1 Runbook JSON schema, catalog UI, help tooltips, GO button, POST /api/runs 23 days Done
P2 Allowlisted executor (bash + node), job store, SSE stream, live panels 34 days Done
P3 Touchpoint grading, compliance assertions, audit ZIP + checksums 23 days Done
P4 Vitest smoke test, docs, env knobs for Windows/Git Bash 1 day Done
P5 AuthN/Z (OIDC/API key), rate limits, queue (Redis) for multi-instance 12 weeks Future
P6 Map remaining docs/** runbooks to specs + narrow allowlist expansion Ongoing Future

Total (P0P4): roughly 913 engineering days for a production-capable v1 on a trusted network.

Wall-clock if focused: about 2 weeks including review, hardening, and operator dry-runs on LAN.