Files
strategic/docs/reports/TODO_SUMMARY.md
2026-02-09 21:51:54 -08:00

4.2 KiB

TODO Summary

Overview

This document summarizes all pending tasks organized by category. All core functionality is complete - these are recommendations for enhanced testing, production readiness, and operational excellence.

Test Coverage (45 tasks)

Unit Tests - Adapters (9 tasks)

  • Aave V3 adapter tests
  • Compound V3 adapter tests
  • Uniswap V3 adapter tests
  • MakerDAO adapter tests
  • Balancer adapter tests
  • Curve adapter tests
  • Lido adapter tests
  • Aggregator adapter tests
  • Perps adapter tests

Unit Tests - Guards (5 tasks)

  • Oracle sanity guard tests (created)
  • TWAP sanity guard tests
  • Min health factor guard tests (created)
  • Max gas guard tests
  • Slippage guard tests
  • Position delta limit guard tests

Unit Tests - Core Components (3 tasks)

  • Price oracle tests (created)
  • Gas estimation tests
  • Strategy compiler tests (all action types)

Integration Tests (10 tasks)

  • Full strategy execution tests (recursive, liquidation, stablecoin hedge, multi-protocol)
  • Flash loan scenario tests
  • Guard evaluation tests (created)
  • Error handling tests

Foundry Tests (10 tasks)

  • Flash loan callback tests (created)
  • Edge case tests (empty batch, large batch, reentrancy, delegatecall, value handling)
  • Security tests

E2E Tests (7 tasks)

  • Fork simulation tests
  • Cross-chain tests (CCIP, LayerZero, message status)

Test Infrastructure (3 tasks)

  • Test utilities creation
  • Test fixtures creation
  • Coverage reporting setup

Production Readiness (64 tasks)

Security & Audit (3 tasks)

  • Professional smart contract audit
  • Internal security code review
  • Penetration testing

Configuration (6 tasks)

  • Address verification
  • Address testing on chains
  • Address documentation
  • RPC endpoint setup
  • Private key configuration (hardware wallet)
  • Monitoring setup

Multi-Sig & Access Control (3 tasks)

  • Multi-sig setup (3-of-5)
  • Separate signers configuration
  • Emergency pause procedures

Deployment Strategy (5 tasks)

  • Testnet deployment and testing
  • Mainnet deployment (limited)
  • Gradual rollout
  • Position limit increases

Monitoring & Alerting (13 tasks)

  • Transaction failure alerts
  • Guard failure alerts
  • Gas usage alerts
  • Price oracle alerts
  • Health factor alerts
  • RPC provider alerts
  • Slippage alerts
  • Unusual activity alerts
  • Balance change alerts
  • Transaction explorer
  • Gas tracker
  • Price feed monitor
  • Health dashboard

Operational Procedures (5 tasks)

  • Emergency procedures documentation
  • Regular maintenance schedule
  • Backup executor deployment
  • State snapshot setup
  • Recovery procedures documentation

Performance Optimization (6 tasks)

  • Gas usage optimization
  • Batch size optimization
  • Connection pooling
  • Price data caching
  • Address/ABI caching
  • Gas estimate caching

Documentation (9 tasks)

  • API documentation (JSDoc)
  • Strategy authoring guide
  • Deployment guide
  • Troubleshooting guide
  • Security best practices
  • Architecture deep dive
  • Protocol integration guide
  • Guard development guide
  • Performance tuning guide

Risk Management (3 tasks)

  • Risk assessment
  • DeFi insurance consideration
  • Position/gas limits
  • Regulatory compliance review
  • Terms of service
  • Privacy policy
  • Risk disclaimers

Post-Deployment (7 tasks)

  • First week monitoring (24/7)
  • First week transaction review
  • First month usage analysis
  • Weekly status reports
  • Monthly metrics review
  • Quarterly security review
  • Annual comprehensive review

Priority Levels

High Priority (Do First)

  1. Security audit
  2. Address verification
  3. Testnet deployment
  4. Critical monitoring setup
  5. Emergency procedures

Medium Priority

  1. Comprehensive test coverage
  2. Production deployment
  3. Performance optimization
  4. Documentation

Low Priority (Nice to Have)

  1. Advanced monitoring features
  2. Extended documentation
  3. Compliance documentation

Progress Tracking

  • Total Tasks: 109
  • Completed: 4 (sample tests created)
  • Pending: 105
  • In Progress: 0

Next Steps

  1. Start with high-priority security and testing tasks
  2. Set up basic monitoring before deployment
  3. Deploy to testnet and validate
  4. Gradually expand to production
  5. Continuously improve based on metrics