20 KiB
DBIS VERSION CONTROL POLICY
Document Version Management Standards
DOCUMENT METADATA
Version: 1.0
Last Updated: [Enter date in ISO 8601 format: YYYY-MM-DD, e.g., 2024-01-15]
Effective Date: [Enter effective date in ISO 8601 format: YYYY-MM-DD, e.g., 2024-01-15]
Status: Active
Authority: DBIS Executive Directorate
OVERVIEW
This policy establishes the version control standards and procedures for all DBIS documentation. It ensures consistent versioning, change tracking, and document lifecycle management across all institutional documents.
VERSION NUMBERING SCHEME
Semantic Versioning (SemVer)
All DBIS documents shall use Semantic Versioning format: MAJOR.MINOR.PATCH
Version Components:
- MAJOR (X.0.0): Breaking changes, major revisions, or fundamental restructuring
- Example: Complete rewrite of document structure
- Example: Changes that invalidate previous interpretations
- MINOR (X.Y.0): New features, additions, or non-breaking changes
- Example: Addition of new sections or chapters
- Example: New procedures or guidelines
- PATCH (X.Y.Z): Bug fixes, corrections, minor updates, or clarifications
- Example: Typo corrections
- Example: Updated cross-references
- Example: Clarification of ambiguous language
Examples:
1.0.0- Initial version1.1.0- Added new section on compliance procedures1.1.1- Fixed typo in Section 3.2, corrected cross-reference2.0.0- Major restructuring of document organization
Version Number Assignment
Initial Version:
- All new documents start at version
1.0.0 - Version
1.0.0indicates the document is complete and approved
Version Updates:
- Increment PATCH for minor corrections:
1.0.0→1.0.1 - Increment MINOR for additions:
1.0.0→1.1.0 - Increment MAJOR for major changes:
1.0.0→2.0.0 - Reset lower numbers when incrementing higher:
1.2.3→2.0.0
DOCUMENT STATUS
Status Definitions
Draft:
- Document is work in progress
- Not yet approved for use
- Subject to revision
- Not binding or authoritative
Active:
- Document is approved and in effect
- Current and authoritative version
- Binding on all relevant parties
- Supersedes all previous versions
Superseded:
- Document has been replaced by a newer version
- Retained for historical reference
- Not current or authoritative
- Clearly marked with supersession notice
Archived:
- Document is no longer in use
- Retained for historical or legal purposes
- Not current or authoritative
- Stored in archive location
Status Transitions
- Draft → Active: Upon approval by appropriate authority
- Active → Superseded: When new version is approved
- Superseded → Archived: After retention period (typically 7 years)
- Active → Archived: When document is no longer needed
REVISION HISTORY
Revision History Requirements
All major documents (Constitutional, Statutory Code, Technical Specifications, Major Manuals) shall include a revision history section.
Revision History Format:
## REVISION HISTORY
| Version | Date | Author | Changes |
|---------|------|--------|---------|
| 1.0.0 | YYYY-MM-DD | [Author/Department] | Initial version |
| 1.1.0 | YYYY-MM-DD | [Author/Department] | Added Section 5.3 on compliance procedures |
| 1.1.1 | YYYY-MM-DD | [Author/Department] | Corrected typo in Section 2.1, updated cross-reference to Title VI |
Revision History Entries:
- Version: Document version number
- Date: Date of change (YYYY-MM-DD format)
- Author: Individual or department making the change
- Changes: Brief description of changes made
Change Description Guidelines
Be Specific:
- Good: "Added Section 3.4 on emergency procedures"
- Bad: "Updated document"
Be Concise:
- Good: "Corrected typo in Section 2.1"
- Bad: "Fixed a small error in the second section"
Group Related Changes:
- Multiple minor corrections in one version: "Corrected typos and updated cross-references throughout"
CHANGE APPROVAL PROCESS
Approval Authority
Constitutional Documents:
- Approval: Sovereign Control Council (SCC)
- Process: Formal resolution required
Statutory Code:
- Approval: Sovereign Control Council (SCC)
- Process: Formal resolution required
Technical Specifications:
- Approval: Technical Department with Executive Directorate review
- Process: Technical review, then executive approval
Operational Manuals:
- Approval: Executive Directorate
- Process: Department review, then executive approval
Procedural Documents:
- Approval: Relevant department head
- Process: Department review and approval
Change Request Process
-
Request Submission:
- Submit change request to document owner
- Include rationale and proposed changes
- Specify proposed version number
-
Review Process:
- Technical review (for technical documents)
- Legal review (for legal documents)
- Compliance review (for compliance documents)
- Stakeholder consultation (for major changes)
-
Approval:
- Approval by designated authority
- Version number assignment
- Effective date determination
-
Implementation:
- Document update
- Revision history entry
- Notification to stakeholders
- Archive previous version
DOCUMENT METADATA REQUIREMENTS
Required Metadata
All documents shall include the following metadata section:
## DOCUMENT METADATA
**Version:** X.Y.Z
**Last Updated:** YYYY-MM-DD
**Effective Date:** YYYY-MM-DD
**Status:** Active/Draft/Superseded/Archived
**Authority:** [Relevant Department or Council]
Metadata Updates
- Version: Updated with each change
- Last Updated: Updated whenever document is modified
- Effective Date: Date when current version becomes effective
- Status: Updated to reflect current document state
- Authority: Remains constant unless authority changes
VERSION CONTROL IN FILE NAMING
Standard File Naming
Current Versions:
- Use standard filename:
Document_Name.md - Do not include version in filename for current versions
Archived Versions:
- Include version in filename:
Document_Name_v1.0.0.md - Store in archive directory
- Maintain original filename for current version
Directory Structure
documents/
├── current/
│ ├── Document_Name.md (current version)
│ └── ...
└── archive/
├── Document_Name_v1.0.0.md
├── Document_Name_v1.1.0.md
└── ...
CHANGE NOTIFICATION
Notification Requirements
When a document is updated:
- Stakeholder Notification: Notify all relevant stakeholders
- Change Summary: Provide summary of changes
- Effective Date: Communicate effective date
- Migration Guide: Provide migration guide for major changes (if applicable)
Notification Channels
- Email notification to relevant parties
- Document repository update notification
- Change log publication
- Training updates (for procedural changes)
DOCUMENT RETENTION
Retention Periods
- Active Documents: Retained indefinitely (current version)
- Superseded Documents: Retained for 7 years minimum
- Archived Documents: Retained per legal and compliance requirements
- Draft Documents: Retained for 1 year after supersession or cancellation
Archive Management
- All superseded versions archived
- Archive location clearly documented
- Archive accessible for historical reference
- Archive indexed for searchability
COMPLIANCE AND AUDIT
Version Control Compliance
- All documents must comply with this policy
- Regular audits of version control compliance
- Non-compliance addressed through corrective action
- Compliance reported to Executive Directorate
Audit Requirements
- Annual review of version control practices
- Verification of revision history accuracy
- Confirmation of proper approval processes
- Documentation of any non-compliance
EXCEPTIONS
Exception Process
Exceptions to this policy may be granted by:
- Constitutional Documents: Sovereign Control Council
- Other Documents: Executive Directorate
Exception Documentation
All exceptions must be:
- Documented in writing
- Approved by appropriate authority
- Reviewed annually
- Justified by business need
VERSION TAGGING
Tag Naming Convention
Tag Format: vX.Y.Z
Examples:
v1.0.0- Initial releasev1.1.0- Minor releasev1.1.1- Patch releasev2.0.0- Major release
Tag Requirements
All Releases Must Be Tagged:
- Major releases: Required
- Minor releases: Required
- Patch releases: Recommended
- Pre-releases: Optional (use
vX.Y.Z-alpha,vX.Y.Z-beta,vX.Y.Z-rc)
Tag Information
Tag Annotations Include:
- Version number
- Release date
- Release notes summary
- Author information
Tag Format:
v1.0.0
Release Date: 2024-01-15
Release Notes: Initial release of document
Author: DBIS Documentation Team
BRANCH MANAGEMENT
Branch Strategy
Main Branch:
mainormaster- Production-ready code- Always stable and deployable
- Protected branch (requires approval for merges)
- Only contains approved, tested changes
Development Branch:
develop- Integration branch for features- Contains latest development changes
- Merged to main for releases
- Used for ongoing development
Feature Branches:
feature/description- Individual feature development- Created from develop branch
- Merged back to develop when complete
- Deleted after merge
Release Branches:
release/vX.Y.Z- Release preparation- Created from develop branch
- Used for final testing and preparation
- Merged to main and develop when ready
Hotfix Branches:
hotfix/description- Critical fixes- Created from main branch
- Merged to main and develop
- Used for urgent fixes
Branch Naming Convention
Format: [type]/[description]
Types:
feature/- New featuresbugfix/- Bug fixeshotfix/- Critical fixesrelease/- Release preparationdocs/- Documentation updates
Examples:
feature/add-compliance-sectionbugfix/fix-cross-referencehotfix/security-updaterelease/v1.1.0docs/update-glossary
Branch Lifecycle
Creation:
- Create branch from appropriate source
- Use descriptive branch name
- Document branch purpose
- Begin development
Development:
- Make changes
- Commit frequently with clear messages
- Keep branch up to date with source
- Test changes
Completion:
- Complete development
- Review changes
- Create merge request
- Get approval
- Merge to target branch
- Delete feature branch
MERGE PROCEDURES
Merge Request Process
Merge Request Requirements:
-
Description:
- Clear description of changes
- Rationale for changes
- Impact assessment
- Testing performed
-
Review:
- Code review (if applicable)
- Documentation review
- Technical review (if technical)
- Approval from reviewer
-
Testing:
- Changes tested
- No breaking changes (unless documented)
- Compliance verified
- Quality checks passed
-
Approval:
- Required approvals obtained
- All checks passed
- Ready for merge
Merge Types
Fast-Forward Merge:
- Preferred for linear history
- No merge commit
- Clean history
- Use when possible
Merge Commit:
- Creates merge commit
- Preserves branch history
- Use for feature branches
- Standard for feature integration
Squash Merge:
- Combines commits into one
- Cleaner history
- Use for feature branches
- Loses individual commit history
Merge Best Practices
Before Merging:
- Update branch with latest changes
- Resolve conflicts
- Run tests
- Verify compliance
- Get approvals
During Merging:
- Use appropriate merge type
- Write clear merge message
- Verify merge success
- Check for issues
After Merging:
- Verify merge result
- Test merged code
- Update documentation
- Delete feature branch
- Notify stakeholders
Conflict Resolution
Conflict Handling:
- Identify conflicts
- Review conflicting changes
- Resolve conflicts
- Test resolution
- Commit resolution
- Continue merge
Conflict Resolution Guidelines:
- Preserve intended functionality
- Maintain consistency
- Document resolution rationale
- Get approval for complex conflicts
RELEASE MANAGEMENT
Release Process
Release Planning:
- Identify release scope
- Plan release timeline
- Assign release responsibilities
- Prepare release notes
- Schedule release
Release Preparation:
- Create release branch
- Finalize changes
- Update version numbers
- Update documentation
- Prepare release notes
Release Testing:
- Comprehensive testing
- Quality assurance
- Compliance verification
- User acceptance testing (if applicable)
- Final approval
Release Execution:
- Merge to main branch
- Create version tag
- Publish release
- Notify stakeholders
- Update documentation
Post-Release:
- Monitor release
- Address issues
- Gather feedback
- Plan next release
- Document lessons learned
Release Types
Major Release (X.0.0):
- Significant changes
- Breaking changes possible
- Requires comprehensive testing
- Requires stakeholder notification
- May require migration guide
Minor Release (X.Y.0):
- New features or additions
- Non-breaking changes
- Requires testing
- Requires notification
- May require training
Patch Release (X.Y.Z):
- Bug fixes and corrections
- No breaking changes
- Limited testing
- Notification as needed
- Quick release
Release Notes
Release Notes Include:
-
Version Information:
- Version number
- Release date
- Release type
-
Changes Summary:
- New features
- Improvements
- Bug fixes
- Breaking changes
-
Impact Assessment:
- User impact
- Process impact
- System impact
-
Action Required:
- Required actions
- Training needs
- Migration steps (if applicable)
-
Additional Information:
- Links to documents
- Support resources
- Contact information
Release Schedule
Regular Releases:
- Major releases: Quarterly or as needed
- Minor releases: Monthly or as needed
- Patch releases: As needed
Emergency Releases:
- Critical fixes
- Security updates
- Compliance requirements
- Immediate release
VERSION INCREMENT DECISION PROCEDURES
When to Increment MAJOR Version (X.0.0)
Increment MAJOR version when:
- Complete document restructuring or reorganization
- Changes that invalidate previous interpretations
- Removal of major sections or procedures
- Fundamental changes to document purpose or scope
- Changes requiring significant retraining
- Breaking changes that affect dependent documents
- Changes to document classification or authority
Examples:
- Restructuring document from linear to hierarchical format
- Removing entire sections that were previously required
- Changing document from procedural to policy document
- Major changes to approval authority or process
Process:
- Document rationale for major version increment
- Get approval from Change Control Board
- Create migration guide if needed
- Notify all stakeholders
- Update all dependent documents
When to Increment MINOR Version (X.Y.0)
Increment MINOR version when:
- Adding new sections, chapters, or procedures
- Adding new features or capabilities
- Expanding existing content significantly
- Adding new appendices or examples
- Non-breaking enhancements
- New compliance requirements added
- Additional guidance or clarification added
Examples:
- Adding new section on compliance procedures
- Adding new operational examples
- Expanding glossary with new terms
- Adding new quick-start guides
- Adding new templates
Process:
- Document additions in change log
- Get approval from Documentation Manager (or CCB for significant additions)
- Update cross-references if needed
- Notify relevant stakeholders
- Update related documents if needed
When to Increment PATCH Version (X.Y.Z)
Increment PATCH version when:
- Typo corrections
- Formatting fixes
- Cross-reference updates
- Minor clarifications
- Link fixes
- Metadata updates
- Minor wording improvements
Examples:
- Fixing typo in Section 2.1
- Correcting broken cross-reference
- Updating date in metadata
- Fixing formatting inconsistency
- Clarifying ambiguous sentence
Process:
- Document correction in change log
- Get approval from Documentation Manager (or auto-approve for minor fixes)
- Update revision history
- No stakeholder notification required (unless critical fix)
Version Increment Decision Tree
Is this a complete restructuring or breaking change?
├─ YES → Increment MAJOR (X.0.0)
└─ NO → Continue
Is this adding new content or features?
├─ YES → Increment MINOR (X.Y.0)
└─ NO → Continue
Is this a correction or minor fix?
├─ YES → Increment PATCH (X.Y.Z)
└─ NO → Review change type again
VERSION CONTROL BEST PRACTICES
General Best Practices
Commit Practices:
- Commit frequently
- Write clear commit messages
- Keep commits focused
- Test before committing
- Review before committing
Commit Message Format:
[Type]: [Brief description]
[Detailed description if needed]
[Related issue/ticket if applicable]
Commit Types:
feat:- New featurefix:- Bug fixdocs:- Documentationstyle:- Formattingrefactor:- Code refactoringtest:- Testingchore:- Maintenance
Branch Practices:
- Use descriptive branch names
- Keep branches focused
- Update branches regularly
- Delete merged branches
- Protect main branch
Merge Practices:
- Review before merging
- Test before merging
- Get approvals
- Resolve conflicts properly
- Document merges
Release Practices:
- Plan releases
- Test thoroughly
- Document releases
- Notify stakeholders
- Monitor releases
Quality Assurance
Pre-Commit Checks:
- Format validation
- Link validation
- Cross-reference validation
- Compliance checks
- Quality checks
Pre-Merge Checks:
- Code review
- Documentation review
- Testing
- Compliance verification
- Approval verification
Pre-Release Checks:
- Comprehensive testing
- Quality assurance
- Compliance verification
- Documentation completeness
- Stakeholder approval
Version Control Workflow
Standard Update Workflow:
-
Identify Need for Update:
- Review update triggers
- Assess change scope
- Determine version increment type
-
Create Change Request:
- Document proposed changes
- Specify version number
- Get initial approval
-
Create Branch:
- Create feature branch:
docs/update-[document-name]-v[X.Y.Z] - Document branch purpose
- Link to change request
- Create feature branch:
-
Make Changes:
- Implement updates
- Update revision history
- Update metadata
- Test changes
-
Review and Approval:
- Code/documentation review
- Quality checks
- Compliance verification
- Get required approvals
-
Merge:
- Merge to main branch
- Create version tag
- Update release notes
-
Notification:
- Notify stakeholders
- Update documentation index
- Archive previous version (if major)
Automated Version Control Procedures
Pre-Commit Hooks (Recommended):
- Verify version number format
- Check revision history updated
- Verify metadata updated
- Run link verification
- Check compliance
Pre-Merge Checks:
- Version number increment verified
- Revision history entry present
- Metadata updated correctly
- All tests passing
- Approvals obtained
Post-Merge Actions:
- Create version tag
- Update release notes
- Archive previous version (if major)
- Notify stakeholders
- Update documentation index
REVIEW AND UPDATES
This policy shall be reviewed:
- Annually: Comprehensive review
- As Needed: When issues arise or processes change
- Upon Request: By Executive Directorate or SCC
Policy updates follow the same version control process as other documents.
END OF VERSION CONTROL POLICY