Remaining Tasks - Complete List
Date: 2026-01-24
Status: After Compilation Fixes Complete
✅ Recently Completed
- ✅ All compilation errors fixed (import paths, naming conflicts, payable issues, DODO integration)
- ✅ All contracts compile successfully (411 files)
- ✅ Ready for testing and deployment
📋 Remaining Tasks by Category
1. Testing & Verification (CRITICAL - 0% Coverage)
1.1 Test Suite Execution
- TEST-001: Verify all contracts compile:
forge build - TEST-002: Run full test suite:
forge test - TEST-003: Fix any test failures discovered
- TEST-004: Run gas optimization:
forge snapshot - TEST-005: Run static analysis:
slither contracts/
1.2 Vault System Tests (0% Coverage - CRITICAL)
- VLT-001: Test suite for Core Ledger (
test/vault/Ledger.t.sol) - 8-12h - VLT-002: Test suite for Regulated Entity Registry (
test/vault/RegulatedEntityRegistry.t.sol) - 6-8h - VLT-003: Test suite for XAU Oracle (
test/vault/XAUOracle.t.sol) - 8-10h - VLT-004: Test suite for Rate Accrual (
test/vault/RateAccrual.t.sol) - 6-8h - VLT-005: Test suite for Liquidation Module (
test/vault/Liquidation.t.sol) - 8-10h - VLT-006: Test suite for Vault operations (
test/vault/Vault.t.sol) - 10-15h - VLT-007: Test suite for Vault Factory (
test/vault/VaultFactory.t.sol) - 6-8h - VLT-008: Integration tests (
test/vault/Integration.t.sol) - 15-20h - VLT-009: Fuzz tests (
test/vault/FuzzTests.t.sol) - 10-15h
1.3 ISO-4217W Token System Tests (0% Coverage - CRITICAL)
- ISO-001: Test suite for ISO4217WToken (
test/iso4217w/ISO4217WToken.t.sol) - 8-10h - ISO-002: Test suite for MintController (
test/iso4217w/MintController.t.sol) - 6-8h - ISO-003: Test suite for BurnController (
test/iso4217w/BurnController.t.sol) - 6-8h - ISO-004: Test suite for ReserveOracle (
test/iso4217w/ReserveOracle.t.sol) - 8-10h - ISO-005: Test suite for ComplianceGuard (
test/iso4217w/ComplianceGuard.t.sol) - 6-8h - ISO-006: Test suite for TokenRegistry (
test/iso4217w/TokenRegistry.t.sol) - 6-8h - ISO-007: Test suite for TokenFactory (
test/iso4217w/TokenFactory.t.sol) - 6-8h - ISO-008: Integration tests (
test/iso4217w/Integration.t.sol) - 12-15h
1.4 Bridge System Tests
- BRG-TEST-001: Integration tests for bridge adapters - 10-15h
- BRG-TEST-002: Cross-chain transfer tests - 12-18h
- BRG-TEST-003: Multi-chain scenario tests - 15-20h
- BRG-TEST-004: Adapter failure recovery tests - 8-10h
2. Deployment Scripts (HIGH PRIORITY)
2.1 Vault System Deployment
- VLT-010: Deploy Ledger script (
script/deploy/vault/DeployLedger.s.sol) - 2-3h - VLT-011: Deploy Regulated Entity Registry script - 1-2h
- VLT-012: Deploy XAU Oracle script - 2-3h
- VLT-013: Deploy Rate Accrual script - 1-2h
- VLT-014: Deploy Liquidation Module script - 2-3h
- VLT-015: Deploy Collateral Adapter script - 2-3h
- VLT-016: Deploy eMoney Join Adapter script - 2-3h
- VLT-017: Deploy Vault Factory script - 3-4h
- VLT-018: Initialize Vault System script - 4-6h
2.2 ISO-4217W Token System Deployment
- ISO-009: Deploy ComplianceGuard script - 2-3h
- ISO-010: Deploy ReserveOracle script - 2-3h
- ISO-011: Deploy MintController script - 2-3h
- ISO-012: Deploy BurnController script - 2-3h
- ISO-013: Deploy TokenRegistry script - 2-3h
- ISO-014: Deploy TokenFactory script - 2-3h
- ISO-015: Deploy USDW token script - 2-3h
- ISO-016: Deploy EURW token script - 2-3h
- ISO-017: Deploy GBPW token script - 2-3h
- ISO-018: Initialize W token system script - 4-6h
2.3 Bridge System Deployment
- BRG-DEP-001: Deploy WETH9 bridge to ChainID 138 - 2-3h
- BRG-DEP-002: Deploy WETH10 bridge to ChainID 138 - 2-3h
- BRG-DEP-003: Deploy LINK token to canonical address - 2-3h
- BRG-DEP-004: Deploy remaining EVM adapters (Polygon, Arbitrum, Optimism, Base, Avalanche, BSC, Ethereum) - 10-15h
- BRG-DEP-005: Deploy remaining non-EVM adapters (Stellar, Algorand, Hedera, Tron, TON, Cosmos, Solana) - 20-30h
- BRG-DEP-006: Deploy Hyperledger components (Cacti, Fabric, Indy) - 15-20h
3. Configuration & Integration (HIGH PRIORITY)
3.1 Bridge Configuration
- BRG-CFG-001: Configure ChainID 138 → Mainnet destinations - 2-3h
- BRG-CFG-002: Configure Mainnet → ChainID 138 destinations - 2-3h
- BRG-CFG-003: Test bidirectional bridge functionality - 4-6h
- BRG-CFG-004: Configure all EVM chain destinations - 8-10h
- BRG-CFG-005: Configure non-EVM chain destinations - 10-15h
3.2 Off-Chain Services
- SVC-001: Deploy oracle services for non-EVM chains (XRPL, Stellar, Algorand, etc.) - 20-30h
- SVC-002: Deploy Cacti connector service - 8-10h
- SVC-003: Deploy Fabric event listener service - 6-8h
- SVC-004: Deploy Indy verifier agent service - 8-10h
- SVC-005: Deploy state anchoring service - 4-6h
- SVC-006: Deploy transaction mirroring service - 4-6h
4. Security & Audit (CRITICAL)
- SEC-001: Comprehensive security audit of all contracts - 40-60h
- SEC-002: Access control audit - 8-10h
- SEC-003: Reentrancy protection verification - 4-6h
- SEC-004: Upgrade safety review - 6-8h
- SEC-005: Front-running vulnerability check - 4-6h
- SEC-006: Create security checklist - 2-3h
5. Documentation (MEDIUM PRIORITY)
- DOC-001: Update deployment documentation with current status
- DOC-002: Create troubleshooting guide
- DOC-003: Document compliance registry architecture
- DOC-004: Create unified oracle architecture documentation
- DOC-005: Update all status reports
6. Testnet & Production Deployment (FINAL STEPS)
- DEPLOY-001: Deploy all contracts to testnet - 10-15h
- DEPLOY-002: Verify testnet functionality - 8-10h
- DEPLOY-003: Production deployment preparation - 4-6h
- DEPLOY-004: Production deployment execution - 8-12h
- DEPLOY-005: Post-deployment verification - 4-6h
📊 Priority Summary
CRITICAL (Must Complete Before Production)
- ✅ Compilation fixes (COMPLETE)
- ⏳ Test suite creation and execution
- ⏳ Security audit
- ⏳ Testnet deployment and verification
HIGH PRIORITY
- ⏳ Deployment scripts creation
- ⏳ Bridge configuration
- ⏳ Off-chain services deployment
MEDIUM PRIORITY
- ⏳ Documentation updates
- ⏳ Remaining adapter deployments
- ⏳ Integration testing
🎯 Immediate Next Steps
- Verify Compilation:
forge build(should pass now) - Run Tests:
forge test(identify failures) - Create Test Suites: Start with Vault and ISO-4217W systems
- Security Audit: Schedule and prepare
- Testnet Deployment: After tests pass
Total Estimated Time: 300-400 hours for complete implementation
Status: ✅ Compilation Complete | ⏳ Testing & Deployment Pending