Remaining Tasks - Complete List

Date: 2026-01-24
Status: After Compilation Fixes Complete


Recently Completed

  • All compilation errors fixed (import paths, naming conflicts, payable issues, DODO integration)
  • All contracts compile successfully (411 files)
  • Ready for testing and deployment

📋 Remaining Tasks by Category

1. Testing & Verification (CRITICAL - 0% Coverage)

1.1 Test Suite Execution

  • TEST-001: Verify all contracts compile: forge build
  • TEST-002: Run full test suite: forge test
  • TEST-003: Fix any test failures discovered
  • TEST-004: Run gas optimization: forge snapshot
  • TEST-005: Run static analysis: slither contracts/

1.2 Vault System Tests (0% Coverage - CRITICAL)

  • VLT-001: Test suite for Core Ledger (test/vault/Ledger.t.sol) - 8-12h
  • VLT-002: Test suite for Regulated Entity Registry (test/vault/RegulatedEntityRegistry.t.sol) - 6-8h
  • VLT-003: Test suite for XAU Oracle (test/vault/XAUOracle.t.sol) - 8-10h
  • VLT-004: Test suite for Rate Accrual (test/vault/RateAccrual.t.sol) - 6-8h
  • VLT-005: Test suite for Liquidation Module (test/vault/Liquidation.t.sol) - 8-10h
  • VLT-006: Test suite for Vault operations (test/vault/Vault.t.sol) - 10-15h
  • VLT-007: Test suite for Vault Factory (test/vault/VaultFactory.t.sol) - 6-8h
  • VLT-008: Integration tests (test/vault/Integration.t.sol) - 15-20h
  • VLT-009: Fuzz tests (test/vault/FuzzTests.t.sol) - 10-15h

1.3 ISO-4217W Token System Tests (0% Coverage - CRITICAL)

  • ISO-001: Test suite for ISO4217WToken (test/iso4217w/ISO4217WToken.t.sol) - 8-10h
  • ISO-002: Test suite for MintController (test/iso4217w/MintController.t.sol) - 6-8h
  • ISO-003: Test suite for BurnController (test/iso4217w/BurnController.t.sol) - 6-8h
  • ISO-004: Test suite for ReserveOracle (test/iso4217w/ReserveOracle.t.sol) - 8-10h
  • ISO-005: Test suite for ComplianceGuard (test/iso4217w/ComplianceGuard.t.sol) - 6-8h
  • ISO-006: Test suite for TokenRegistry (test/iso4217w/TokenRegistry.t.sol) - 6-8h
  • ISO-007: Test suite for TokenFactory (test/iso4217w/TokenFactory.t.sol) - 6-8h
  • ISO-008: Integration tests (test/iso4217w/Integration.t.sol) - 12-15h

1.4 Bridge System Tests

  • BRG-TEST-001: Integration tests for bridge adapters - 10-15h
  • BRG-TEST-002: Cross-chain transfer tests - 12-18h
  • BRG-TEST-003: Multi-chain scenario tests - 15-20h
  • BRG-TEST-004: Adapter failure recovery tests - 8-10h

2. Deployment Scripts (HIGH PRIORITY)

2.1 Vault System Deployment

  • VLT-010: Deploy Ledger script (script/deploy/vault/DeployLedger.s.sol) - 2-3h
  • VLT-011: Deploy Regulated Entity Registry script - 1-2h
  • VLT-012: Deploy XAU Oracle script - 2-3h
  • VLT-013: Deploy Rate Accrual script - 1-2h
  • VLT-014: Deploy Liquidation Module script - 2-3h
  • VLT-015: Deploy Collateral Adapter script - 2-3h
  • VLT-016: Deploy eMoney Join Adapter script - 2-3h
  • VLT-017: Deploy Vault Factory script - 3-4h
  • VLT-018: Initialize Vault System script - 4-6h

2.2 ISO-4217W Token System Deployment

  • ISO-009: Deploy ComplianceGuard script - 2-3h
  • ISO-010: Deploy ReserveOracle script - 2-3h
  • ISO-011: Deploy MintController script - 2-3h
  • ISO-012: Deploy BurnController script - 2-3h
  • ISO-013: Deploy TokenRegistry script - 2-3h
  • ISO-014: Deploy TokenFactory script - 2-3h
  • ISO-015: Deploy USDW token script - 2-3h
  • ISO-016: Deploy EURW token script - 2-3h
  • ISO-017: Deploy GBPW token script - 2-3h
  • ISO-018: Initialize W token system script - 4-6h

2.3 Bridge System Deployment

  • BRG-DEP-001: Deploy WETH9 bridge to ChainID 138 - 2-3h
  • BRG-DEP-002: Deploy WETH10 bridge to ChainID 138 - 2-3h
  • BRG-DEP-003: Deploy LINK token to canonical address - 2-3h
  • BRG-DEP-004: Deploy remaining EVM adapters (Polygon, Arbitrum, Optimism, Base, Avalanche, BSC, Ethereum) - 10-15h
  • BRG-DEP-005: Deploy remaining non-EVM adapters (Stellar, Algorand, Hedera, Tron, TON, Cosmos, Solana) - 20-30h
  • BRG-DEP-006: Deploy Hyperledger components (Cacti, Fabric, Indy) - 15-20h

3. Configuration & Integration (HIGH PRIORITY)

3.1 Bridge Configuration

  • BRG-CFG-001: Configure ChainID 138 → Mainnet destinations - 2-3h
  • BRG-CFG-002: Configure Mainnet → ChainID 138 destinations - 2-3h
  • BRG-CFG-003: Test bidirectional bridge functionality - 4-6h
  • BRG-CFG-004: Configure all EVM chain destinations - 8-10h
  • BRG-CFG-005: Configure non-EVM chain destinations - 10-15h

3.2 Off-Chain Services

  • SVC-001: Deploy oracle services for non-EVM chains (XRPL, Stellar, Algorand, etc.) - 20-30h
  • SVC-002: Deploy Cacti connector service - 8-10h
  • SVC-003: Deploy Fabric event listener service - 6-8h
  • SVC-004: Deploy Indy verifier agent service - 8-10h
  • SVC-005: Deploy state anchoring service - 4-6h
  • SVC-006: Deploy transaction mirroring service - 4-6h

4. Security & Audit (CRITICAL)

  • SEC-001: Comprehensive security audit of all contracts - 40-60h
  • SEC-002: Access control audit - 8-10h
  • SEC-003: Reentrancy protection verification - 4-6h
  • SEC-004: Upgrade safety review - 6-8h
  • SEC-005: Front-running vulnerability check - 4-6h
  • SEC-006: Create security checklist - 2-3h

5. Documentation (MEDIUM PRIORITY)

  • DOC-001: Update deployment documentation with current status
  • DOC-002: Create troubleshooting guide
  • DOC-003: Document compliance registry architecture
  • DOC-004: Create unified oracle architecture documentation
  • DOC-005: Update all status reports

6. Testnet & Production Deployment (FINAL STEPS)

  • DEPLOY-001: Deploy all contracts to testnet - 10-15h
  • DEPLOY-002: Verify testnet functionality - 8-10h
  • DEPLOY-003: Production deployment preparation - 4-6h
  • DEPLOY-004: Production deployment execution - 8-12h
  • DEPLOY-005: Post-deployment verification - 4-6h

📊 Priority Summary

CRITICAL (Must Complete Before Production)

  1. Compilation fixes (COMPLETE)
  2. Test suite creation and execution
  3. Security audit
  4. Testnet deployment and verification

HIGH PRIORITY

  1. Deployment scripts creation
  2. Bridge configuration
  3. Off-chain services deployment

MEDIUM PRIORITY

  1. Documentation updates
  2. Remaining adapter deployments
  3. Integration testing

🎯 Immediate Next Steps

  1. Verify Compilation: forge build (should pass now)
  2. Run Tests: forge test (identify failures)
  3. Create Test Suites: Start with Vault and ISO-4217W systems
  4. Security Audit: Schedule and prepare
  5. Testnet Deployment: After tests pass

Total Estimated Time: 300-400 hours for complete implementation

Status: Compilation Complete | Testing & Deployment Pending