158 lines
5.7 KiB
Markdown
158 lines
5.7 KiB
Markdown
# Project Charter - Dubai Metaverse
|
|
|
|
## Vision Statement
|
|
|
|
Create a **studio-grade, cinematic, 8K-ready, interactive Dubai Metaverse Slice** that demonstrates the potential of next-generation real-time 3D environments. This project will serve as a high-end demo district showcasing photoreal visual fidelity, advanced gameplay systems, and cutting-edge technology integration.
|
|
|
|
## Project Goals
|
|
|
|
### Primary Goals
|
|
|
|
1. **Visual Excellence**: Achieve photoreal visual fidelity with 8K-quality cinematic output
|
|
2. **Interactive Experience**: Create a fully explorable environment with functional gameplay systems
|
|
3. **Technical Innovation**: Leverage Unreal Engine 5.4's latest features (Nanite, Lumen, PCG, MetaHumans)
|
|
4. **Performance Optimization**: Maintain 60-90 FPS on desktop hardware while delivering cinematic quality
|
|
5. **Scalability**: Build a foundation that can scale to a full metaverse experience
|
|
|
|
### Secondary Goals
|
|
|
|
1. **AI Integration**: Implement ChatGPT-powered NPC dialogue system
|
|
2. **VR Support**: Optional VR compatibility for immersive exploration
|
|
3. **Cloud Streaming**: Pixel Streaming support for web-based access
|
|
4. **Documentation**: Comprehensive technical documentation for developer handoff
|
|
|
|
## Scope
|
|
|
|
### In Scope
|
|
|
|
- **Geographic Area**: 3-6 urban blocks + 1 signature landmark in Dubai
|
|
- **Target Districts**: Marina, Downtown, DIFC, or City Walk (to be selected)
|
|
- **Hero Landmark**: One iconic Dubai structure (e.g., Museum of the Future, Marina towers)
|
|
- **Visual Systems**:
|
|
- Photorealistic architecture and materials
|
|
- Dynamic lighting with day/night cycle
|
|
- Weather systems (heat haze, dust, humidity)
|
|
- Water simulation (Marina)
|
|
- **Gameplay Systems**:
|
|
- Player movement (first/third-person)
|
|
- Vehicle driving (Chaos physics)
|
|
- NPC interactions (MetaHumans)
|
|
- Environmental interactions (doors, info panels, holograms)
|
|
- **Technical Systems**:
|
|
- Procedural city generation (PCG + Houdini)
|
|
- World Partition for large world streaming
|
|
- 8K cinematic rendering (Movie Render Queue)
|
|
- Performance optimization (LOD, streaming, Nanite)
|
|
|
|
### Out of Scope
|
|
|
|
- Full city recreation (only mini-district)
|
|
- Multiplayer networking (single-player focus)
|
|
- Complex quest systems (simple navigation/exploration)
|
|
- Full VR implementation (optional stub only)
|
|
- Mobile platform support
|
|
- Full audio production (ambient audio only)
|
|
|
|
## Success Criteria
|
|
|
|
### Technical Success Metrics
|
|
|
|
1. **Performance**:
|
|
- 60-90 FPS at 1440p/4K on target hardware
|
|
- Smooth streaming with World Partition
|
|
- 8K EXR cinematic output renders successfully
|
|
|
|
2. **Visual Quality**:
|
|
- Hero asset achieves photoreal quality (8K textures, Nanite)
|
|
- Lighting matches Dubai aesthetic (Lumen GI)
|
|
- Materials demonstrate PBR workflow excellence
|
|
|
|
3. **System Functionality**:
|
|
- All core interactions work as designed
|
|
- Vehicle physics feel realistic
|
|
- NPCs behave naturally
|
|
- Day/night cycle transitions smoothly
|
|
|
|
### Deliverable Success Metrics
|
|
|
|
1. **Playable Demo**: Fully explorable district with all systems functional
|
|
2. **Cinematic Trailer**: 45-60 second 8K cinematic showcasing the environment
|
|
3. **Documentation**: Complete technical documentation for handoff
|
|
4. **Code Quality**: Clean, documented, scalable codebase
|
|
5. **Asset Organization**: Properly named, organized, and cataloged assets
|
|
|
|
### Business Success Metrics
|
|
|
|
1. **Investor Appeal**: Demo suitable for investor presentations
|
|
2. **Client Demonstration**: Showcase quality for potential clients
|
|
3. **Technical Proof**: Demonstrates capability for larger metaverse projects
|
|
4. **Partnership Readiness**: Codebase ready for partnership discussions
|
|
|
|
## Project Constraints
|
|
|
|
### Time Constraints
|
|
|
|
- **Total Duration**: 90 days
|
|
- **Phases**: 5 phases with specific week-by-week milestones
|
|
- **Critical Path**: Hero asset completion, lighting setup, performance optimization
|
|
|
|
### Resource Constraints
|
|
|
|
- **Team Size**: [To be determined]
|
|
- **Budget**: [To be determined]
|
|
- **Hardware**: Requires high-end development workstations
|
|
- **Software Licenses**: Unreal Engine, Houdini, Substance Suite
|
|
|
|
### Technical Constraints
|
|
|
|
- **Engine Version**: Must use Unreal Engine 5.4 (specific features required)
|
|
- **Platform**: Primary focus on Windows desktop
|
|
- **File Size**: Large assets require Git LFS or Perforce
|
|
- **Performance**: Must balance visual quality with real-time performance
|
|
|
|
## Risks and Mitigation
|
|
|
|
### Technical Risks
|
|
|
|
1. **Performance Issues**
|
|
- Risk: Cannot achieve target FPS with full visual quality
|
|
- Mitigation: Early performance testing, LOD system, optimization passes
|
|
|
|
2. **Asset Pipeline Complexity**
|
|
- Risk: Photogrammetry and procedural generation integration challenges
|
|
- Mitigation: Early pipeline testing, documentation, automation scripts
|
|
|
|
3. **Nanite/Lumen Compatibility**
|
|
- Risk: Some assets may not work with Nanite or Lumen
|
|
- Mitigation: Early testing, fallback strategies, documentation
|
|
|
|
### Schedule Risks
|
|
|
|
1. **Scope Creep**
|
|
- Risk: Adding features beyond original scope
|
|
- Mitigation: Strict scope definition, change control process
|
|
|
|
2. **Asset Creation Delays**
|
|
- Risk: Hero asset or buildings take longer than estimated
|
|
- Mitigation: Early start on hero asset, parallel workstreams
|
|
|
|
3. **Integration Issues**
|
|
- Risk: Systems integration takes longer than expected
|
|
- Mitigation: Early integration testing, modular design
|
|
|
|
## Stakeholders
|
|
|
|
- **Project Lead**: [To be determined]
|
|
- **Technical Director**: [To be determined]
|
|
- **Art Director**: [To be determined]
|
|
- **Investors/Clients**: [To be determined]
|
|
|
|
## Approval
|
|
|
|
This project charter is approved and authorizes the project team to proceed with Phase 1 implementation.
|
|
|
|
**Approved By**: [To be determined]
|
|
**Date**: [Current Date]
|
|
**Version**: 1.0
|
|
|