# Phase 1 Tasks - Pre-Production (Days 1-15)
|
|
|
|
## Week 1: Vision, Scope, & Pipeline Setup (Days 1-7)
|
|
|
|
### Documentation Tasks
|
|
|
|
- [ ] Create README.md
|
|
- [ ] Create PROJECT_CHARTER.md
|
|
- [ ] Create TECHNICAL_BRIEF.md
|
|
- [ ] Create ART_BIBLE.md
|
|
- [ ] Create DISTRICT_SELECTION.md
|
|
- [ ] Create PROJECT_PLAN.md
|
|
- [ ] Create PIPELINE.md
|
|
- [ ] Create NAMING_CONVENTIONS.md
|
|
- [ ] Create UE5_SETUP.md
|
|
- [ ] Create PROJECT_SETTINGS.md
|
|
- [ ] Create PLUGINS.md
|
|
- [ ] Create VERSION_CONTROL.md
|
|
- [ ] Create MILESTONES.md
|
|
|
|
### Version Control Setup
|
|
|
|
- [ ] Create .gitignore
|
|
- [ ] Create .gitattributes
|
|
- [ ] Initialize Git repository
|
|
- [ ] Install and configure Git LFS
|
|
- [ ] Test Git LFS with sample files
|
|
- [ ] Set up remote repository (if applicable)
|
|
|
|
### Unreal Engine Setup
|
|
|
|
- [ ] Install Unreal Engine 5.4
|
|
- [ ] Create new UE5 project (DubaiMetaverse)
|
|
- [ ] Configure project settings (Nanite, Lumen, World Partition)
|
|
- [ ] Set up project folder structure
|
|
- [ ] Install required plugins (PCG, MRQ, Virtual Production Tools)
|
|
- [ ] Verify plugins are working
|
|
- [ ] Test basic Nanite mesh import
|
|
- [ ] Test Lumen lighting
|
|
- [ ] Test World Partition
|
|
|
|
### Project Management
|
|
|
|
- [ ] Set up task tracking system
|
|
- [ ] Create milestone tracking
|
|
- [ ] Set up communication channels
|
|
- [ ] Schedule weekly reviews
|
|
|
|
## Week 2: Geospatial Acquisition + Blockout (Days 8-15)
|
|
|
|
### Data Acquisition
|
|
|
|
- [ ] Research OpenStreetMap data sources for Dubai Marina
|
|
- [ ] Download OpenStreetMap building data
|
|
- [ ] Download GIS/DEM elevation data
|
|
- [ ] Process OpenStreetMap data
|
|
- [ ] Process elevation data for terrain
|
|
- [ ] Validate data accuracy
|
|
|
|
### Blockout Creation
|
|
|
|
- [ ] Import OpenStreetMap data to Unreal
|
|
- [ ] Generate terrain from elevation data
|
|
- [ ] Create building footprint meshes
|
|
- [ ] Place buildings in blockout level
|
|
- [ ] Create road network
|
|
- [ ] Add basic navigation paths
|
|
- [ ] Validate scale (1:1)
|
|
- [ ] Test navigation flow
|
|
|
|
### Asset Planning
|
|
|
|
- [ ] Analyze blockout and identify assets
|
|
- [ ] Create Tier 1 asset list (Hero: Cayan Tower)
|
|
- [ ] Create Tier 2 asset list (Primary buildings: 20-40)
|
|
- [ ] Create Tier 3 asset list (Background buildings)
|
|
- [ ] Create prop asset list
|
|
- [ ] Create vehicle asset list
|
|
- [ ] Create material requirements list
|
|
- [ ] Document asset specifications
|
|
|
|
### Photogrammetry Planning
|
|
|
|
- [ ] Identify buildings for photogrammetry
|
|
- [ ] Plan photography sessions (if on-site)
|
|
- [ ] Research photogrammetry tools (RealityCapture, Luma AI)
|
|
- [ ] Set up photogrammetry workflow
|
|
- [ ] Test photogrammetry pipeline with sample
|
|
|
|
### Blockout Review
|
|
|
|
- [ ] Internal blockout review
|
|
- [ ] Stakeholder review
|
|
- [ ] Gather feedback
|
|
- [ ] Update blockout based on feedback
|
|
- [ ] Finalize blockout layout
|
|
- [ ] Document blockout decisions
|
|
|
|
## Deliverables Checklist
|
|
|
|
### Week 1 Deliverables
|
|
|
|
- [ ] All documentation complete
|
|
- [ ] Version control configured
|
|
- [ ] UE5 project ready
|
|
- [ ] Plugins installed
|
|
- [ ] Project structure created
|
|
|
|
### Week 2 Deliverables
|
|
|
|
- [ ] Geospatial data acquired
|
|
- [ ] Blockout level playable
|
|
- [ ] Asset list complete
|
|
- [ ] Blockout reviewed and approved
|
|
|
|
## Notes
|
|
|
|
- Focus on accuracy in Week 2 - blockout scale must be 1:1
|
|
- Asset list should be comprehensive - better to over-plan than under-plan
|
|
- Photogrammetry can be done in parallel with other work if resources allow
|
|
|
|
---
|
|
|
|
**Status**: In Progress
|
|
**Last Updated**: [Current Date]
|
|
|