Files
smom-dbis-138/runbooks/ccip-operations.md
defiQUG 1fb7266469 Add Oracle Aggregator and CCIP Integration
- Introduced Aggregator.sol for Chainlink-compatible oracle functionality, including round-based updates and access control.
- Added OracleWithCCIP.sol to extend Aggregator with CCIP cross-chain messaging capabilities.
- Created .gitmodules to include OpenZeppelin contracts as a submodule.
- Developed a comprehensive deployment guide in NEXT_STEPS_COMPLETE_GUIDE.md for Phase 2 and smart contract deployment.
- Implemented Vite configuration for the orchestration portal, supporting both Vue and React frameworks.
- Added server-side logic for the Multi-Cloud Orchestration Portal, including API endpoints for environment management and monitoring.
- Created scripts for resource import and usage validation across non-US regions.
- Added tests for CCIP error handling and integration to ensure robust functionality.
- Included various new files and directories for the orchestration portal and deployment scripts.
2025-12-12 14:57:48 -08:00

4.1 KiB

CCIP Operations Runbook

Overview

This runbook provides operational procedures for managing CCIP (Chainlink Cross-Chain Interoperability Protocol) on the DeFi Oracle Meta Mainnet.

Daily Operations

Health Checks

  1. Check CCIP Router Status

    kubectl get pods -n besu-network -l app=ccip-router
    kubectl logs -n besu-network -l app=ccip-router --tail=100
    
  2. Check Message Processing

    # Check recent messages
    cast logs --from-block latest-100 --address $CCIP_SENDER --rpc-url $RPC_URL | grep MessageSent
    
  3. Monitor Metrics

    • Message send success rate
    • Message delivery latency
    • Fee consumption
    • Error rates
  1. Check Balance

    cast call $LINK_TOKEN "balanceOf(address)" $CCIP_SENDER --rpc-url $RPC_URL
    
  2. Set Alert Threshold

    • Alert when balance < 10 LINK
    • Alert when balance < 5 LINK (critical)
  3. Refill Balance

    cast send $LINK_TOKEN "transfer(address,uint256)" $CCIP_SENDER $AMOUNT \
      --rpc-url $RPC_URL --private-key $PRIVATE_KEY
    

Weekly Operations

Review Message Statistics

  1. Message Volume

    • Total messages sent
    • Success rate
    • Average latency
  2. Fee Analysis

    • Total fees spent
    • Average fee per message
    • Fee trends
  3. Error Analysis

    • Error types
    • Error frequency
    • Root causes

Performance Review

  1. Latency Analysis

    • Average delivery time
    • P95/P99 latency
    • Outliers
  2. Throughput

    • Messages per hour/day
    • Peak load times
    • Capacity planning

Monthly Operations

Security Review

  1. Access Control Audit

    • Review authorized senders/receivers
    • Check for unauthorized access
    • Verify role assignments
  2. Message Validation

    • Review message format compliance
    • Check for anomalies
    • Verify replay protection

Cost Optimization

  1. Fee Optimization

    • Review fee trends
    • Identify optimization opportunities
    • Implement improvements
  2. Message Optimization

    • Reduce message size
    • Batch updates when possible
    • Optimize encoding

Incident Response

Message Delivery Failure

  1. Identify Issue

    • Check message status
    • Verify target chain status
    • Check router logs
  2. Diagnose

    • Check LINK balance
    • Verify router configuration
    • Check target chain connectivity
  3. Resolve

    • Fix underlying issue
    • Resend message if needed
    • Update configuration if required

High Error Rate

  1. Investigate

    • Check error logs
    • Identify error patterns
    • Review recent changes
  2. Mitigate

    • Pause sending if critical
    • Fix root cause
    • Resume operations

Router Unavailable

  1. Check Status

    • Verify router deployment
    • Check service health
    • Review logs
  2. Recovery

    • Restart router if needed
    • Verify connectivity
    • Test message sending

Maintenance

Contract Upgrades

  1. Plan Upgrade

    • Review upgrade proposal
    • Test in staging
    • Schedule maintenance window
  2. Execute Upgrade

    • Pause operations
    • Deploy new contracts
    • Update configurations
    • Resume operations
  3. Verify

    • Test message sending
    • Verify message receiving
    • Monitor for issues

Configuration Changes

  1. Review Impact

    • Assess change impact
    • Test in staging
    • Plan rollback
  2. Apply Changes

    • Update configuration
    • Monitor closely
    • Verify functionality

Monitoring

Key Metrics

  • ccip_messages_sent_total: Total messages sent
  • ccip_messages_received_total: Total messages received
  • ccip_message_latency_seconds: Message delivery latency
  • ccip_fees_total: Total LINK spent on fees
  • ccip_errors_total: Total errors

Alerts

  • High error rate (> 5%)
  • Low success rate (< 95%)
  • High latency (> 5 minutes)
  • Low LINK balance (< 10 LINK)
  • Router unavailable

References